Laserfiche WebLink
URBEMIS Summary Sheet <br />Project Name: <br />Developer: <br />1.27 45 <br />3,372 392 <br />3,555 2% <br />98% <br />Yes 80% <br />444 0 <br />0% <br />8 <br />2.81 <br />6.9 <br />5.84 15.4% <br />ITE Unmitigated Urbemis <br />Mitigated % Reduction <br />5.8 3.8 <br />262.8 169.4 <br />49.9 32.2 35.6%** <br />2246.9 1448.4 35.5% <br />47.0 30.3 <br />385.9 248.8 35.5% <br />6.9% <br />2.0% <br />6.5% <br />6.3% <br />0.0% <br />1388 Bancroft Ave., San Leandro <br />Site Data <br />Eden Realty <br />URBEMIS File Location: <br />David BezzerNina Rizzo <br />Place Type: <br />Prepared by: QAQC Check: <br />Town center <br />Operational Data <br />Mix of Uses <br />Number of housing units within 1/2 mile radius <br />Note: This includes the units in the development <br />Employment within 1/2 mile radius <br />Local Serving Retail Presence <br />% of streets in 1/2 mile with sidewalks on 1 side <br />% of streets in 1/2 mile with sidewalks on 2 sides <br />Bike and Pedestrians <br />Number of valences (intersection count, walkability <br />measure) per square mile <br />Total acres <br />Acres minus common space/yard space <br />(acres - common) <br />Land Use Data <br />Mixed-Use Residential <br />Apartments Low Rise <br />% of arterials/collectors with bike lanes <br /> (or where suitable, direct parallel routes exist) <br />Affordable Housing <br />Percentage of Affordable housing <br />Local serving retail would include grocery store, <br />pharmacy, hardware store, dry cleaners, café, gym, etc. <br />Transit Services <br /># of daily weekday buses stopping w/in 1/4 mile of Number of Affordable Units <br />Affordable Housing <br />Daily pounds of CO2 unmitigated/Dwelling Unit <br />Total Annual tons of CO2 (From Annual calculations) <br />Operational Mitigations <br />Mix of Use <br />Local Serving Retail <br />Transit Service <br />Pedestrian/Bicycle Friendliness <br />Total Daily VMT (Annual Average Calculation) <br />0 <br />** % Improvement over Bay Area Average of 50 VMT/DU <br /># of daily rail/BRT stopping w/in 1/2 mi of site <br /># of dedicated daily shuttle trips <br />Density Adjustment <br />Operational Results <br />Daily Trips/Unit <br />Total Daily Trips <br />Daily VMT/Housing Unit <br />Default Acreage from URBEMIS <br />Default Trip/Day Generation Rate <br />Adjusted Trip Generation for higher density <br />URBEMIS Output Data <br />20180621_URBEMIS_1388Bancroft:Project Name 6/27/2018