My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearing 2019 0204
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0204
>
5A Public Hearing 2019 0204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 3:43:39 PM
Creation date
1/30/2019 3:43:11 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/4/2019
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
4.0 LIST OF MITIGATION MEASURES <br />1388 Bancroft Avenue Project City of San Leandro <br />Initial Study/Mitigated Negative Declaration November 2018 <br />4.0-4 <br />• Approximately 2 feet of undocumented clayey to well-graded sand fill was encountered below the surface. This loose fill shall be overexcavated and re-compacted within the proposed building footprint. Any undocumented <br />fills encountered during the demolition of the northern building basement <br />level should also be re-compacted prior to the placement of new fill. <br />• A portion of the proposed building would straddle deeper fill that would be required in order to fill the existing basement. Deeper fill transitions shall be <br />overexcavated at an inclination of 3:1 or flatter and rebuilt with engineered <br />fill to reduce the potential for differential movement beneath at-grade structures. <br />• The corrosion potential for buried metallic structures, such as metal pipes, is <br />considered moderate. Metal pipes installed as part of the project shall have <br />special protection incorporated. <br />Timing/Implementation: During grading and construction <br />Enforcement/Monitoring: City of San Leandro Community Development <br />Department; and Engineering and <br />Transportation Department <br />HAZARDS AND HAZARDOUS MATERIALS (SUBSECTION 3.8) <br />MM HAZ-1 Prior to demolition of existing structures on the project site, asbestos-containing <br />materials and lead-based paint surveys shall be conducted to determine the presence of hazardous building materials and results of those surveys shall be <br />provided prior to the issuance of demolition or building permits. Should <br />asbestos-containing materials, lead-based paint, or other hazardous <br />substance–containing building materials be identified, these materials shall be removed using proper techniques in compliance with all applicable state and <br />federal regulations, including the BAAQMD rule related to asbestos. <br />Timing/Implementation: Prior to issuance of building permits <br />Enforcement/Monitoring: City of San Leandro Community Development Department <br />NOISE (SUBSECTION 3.12) <br />MM NOI-1 To prevent damage to off-site structures, during construction activities, the project applicant and/or its contractor shall ensure compliance with, and the <br />City shall note on grading and building permits: Vibratory rollers shall not be <br />used in dynamic mode (i.e., rolling motion only with no vibration) within 25 feet <br />of any existing off-site structure. Other vibratory compaction methods such as plate compactors would be acceptable. <br />Timing/Implementation: During grading and excavation <br />Enforcement/Monitoring: City of San Leandro Community Development <br />Department
The URL can be used to link to this page
Your browser does not support the video tag.