Laserfiche WebLink
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor <br />Demolition Concrete/Industrial Saws 1 2.00 81 0.73 <br />Demolition Rubber Tired Dozers 1 6.00 247 0.40 <br />Demolition Tractors/Loaders/Backhoes 2 8.00 97 0.37 <br />Site Preparation Graders 1 2.00 187 0.41 <br />Site Preparation Rubber Tired Dozers 1 4.00 247 0.40 <br />Site Preparation Tractors/Loaders/Backhoes 1 4.00 97 0.37 <br />Grading Graders 1 6.00 187 0.41 <br />Grading Rubber Tired Dozers 1 4.00 247 0.40 <br />Grading Tractors/Loaders/Backhoes 1 4.00 97 0.37 <br />Building Construction Cranes 1 2.00 231 0.29 <br />Building Construction Forklifts 1 4.00 89 0.20 <br />Building Construction Generator Sets 1 1.00 84 0.74 <br />Building Construction Tractors/Loaders/Backhoes 1 4.00 97 0.37 <br />Building Construction Welders 1 1.00 46 0.45 <br />Architectural Coating Air Compressors 1 1.00 78 0.48 <br />Paving Cement and Mortar Mixers 1 6.00 9 0.56 <br />Paving Pavers 1 6.00 130 0.42 <br />Paving Paving Equipment 1 8.00 132 0.36 <br />Paving Rollers 1 7.00 80 0.38 <br />Paving Tractors/Loaders/Backhoes 1 8.00 97 0.37 <br />Trips and VMT <br />CalEEMod Version: CalEEMod.2016.3.2 Date: 8/16/2018 8:58 AMPage 10 of 35 <br />1388 Bancroft Avenue - Alameda County, Annual