Laserfiche WebLink
Unfunded CIP Projects <br />Project Number Group Project Name Estimated Project Cost Weighted Score <br />2020.3060 Parks and Open Space Long Beach Restoration $1,800,000 125 <br />2007.0150 Parks and Open Space Muir Soccer Field Renovation $1.6M to $3.2M 105 <br />2018.3010 Parks and Open Space East Bay Greenway >$6.4M 100 <br />2020.3040 Parks and Open Space ADA Playground Improvements $400k to $800k 90 <br />2020.3030 Parks and Open Space Lola St Park Improvements $3.2M to $6.4M 90 <br />2018.3000 Parks and Open Space Park Building Roof Replacement $100k to $200k 90 <br />2003.0160 Parks and Open Space Chabot Park Master Plan Construction $3.2M to $6.4M 85 <br />2016.0405 Parks and Open Space Washington Manor Park Back Play Area $400k to $800k 85 <br />2017.0400 Parks and Open Space Marina Park Replace North End Play Equip $400k to $800k 80 <br />2016.0390 Parks and Open Space Stenzel Park Well & Irrigation Renovatio $800k to $1.6M 80 <br />2015.0250 Parks and Open Space Thrasher Park Field Rehabilitation $400k to $800k 80 <br />2014.0410 Parks and Open Space Toyon Park Irrigation Replacement $400k to $800k 80 <br />2003.0590 Parks and Open Space Washington Manor Park Picnic Area Renova $400k to $800k 80 <br />2009.0090 Parks and Open Space Memorial Park Play/Picnic Renovation $200k to $400k 75 <br />2020.2800 Parks and Open Space Monarch Bay Drive Parking Improvements $200k to $400k 75 <br />2015.0240 Parks and Open Space Stenzel Park Field 1&2 Rehabilitation $800k to $1.6M 75 <br />2009.0100 Parks and Open Space Bonaire Park Picnic Area Renovation $100k to $200k 70 <br />2014.0380 Parks and Open Space SL Ballpark Irrigation Renovation $200k to $400k 70 <br />2016.0410 Parks and Open Space SL Creek Trail Root Park to SPRR $3.2M to $6.4M 70 <br />2018.3070 Parks and Open Space Washington Manor Park Tai Chi Expansion <$100k 70 <br />2009.0410 Parks and Open Space Cherry Grove Restroom Replacement $200k to $400k 65 <br />2018.3060 Parks and Open Space Replace Golf Cart Bridge Deck $100k to $200k 65 <br />2018.3050 Parks and Open Space San Leandro Cr Vegetation Managemnt Plan <$100k 65 <br />2017.0420 Parks and Open Space Construct Park at Begier and E14th $800k to $1.6M 60 <br />2012.0060 Parks and Open Space Stenzel Park South Play Area $100k to $200k 60 <br />2008.0020 Parks and Open Space Thrasher Park Outfield Fence <$100k 60 <br />2020.3050 Parks and Open Space School Street Dog Park $800k to $1.6M 55 <br />2012.0030 Parks and Open Space Chabot Park Parking Lot Improvements $400k to $800k 45 <br />2020.3100 Parks and Open Space Dredge Material Site Wetland Conversion $1.6M to $3.2M 35 <br />2018.3015 Parks and Open Space Park Reservation Signage <$100k 35 <br />Page 4