Laserfiche WebLink
Unfunded CIP Projects <br />Project Number Group Project Name Estimated Project Cost Weighted Score <br />2018.3820 Traffic Safety Traffic Safety Imp at RR crossings $100k to $200k 85 <br />2003.0480 Traffic Safety UPRR Quiet Zone crossings on Niles Track $3.2M to $6.4M 75 <br />2018.4820 Traffic Safety Alvarado Fremont Bulb Out $100k to $200k 65 <br />2018.5660 Traffic Safety Timothy Drive Traffic Channelization $100k to $200k 55 <br />2018.3800 Traffic Safety UPRR Grade Separation Washington to Hesp >$6.4M 55 <br />2018.5600 Traffic Safety Washington Lewelling Intersection Imp $100k to $200k 50 <br />2019.4420 Traffic Safety SLB Best Concrete Bulb Outs $200k to $400k 35 <br />2018.5640 Traffic Safety SLB Broadmoor Traffic Circle $200k to $400k 25 <br />Page 6