My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2019 0219
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0219
>
8E Consent 2019 0219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 6:36:26 PM
Creation date
2/13/2019 6:36:24 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/19/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and NBS for Eden Road Page 13 of 16 <br />California Fair Political Practices Commission. If Consultant is required to file a Form 700, Consultant is hereby advised to contact the San Leandro City Clerk for the Form 700 and directions on how to prepare it. 10.8 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or interview related to this Agreement, either orally or through any written materials. 10.9 Contract Administration. This Agreement shall be administered by Nick Thom ("Contract Administrator"). All correspondence shall be directed to or through the Contract Administrator or his or her designee. 10.10 Notices. Any written notice to Consultant shall be sent to: Michael Rentner, President and CEO NBS 870 Market Street, Suite 1223 San Francisco, CA 94102 MRentner@NBSgov.com 800-676-7516 Any written notice to City shall be sent to: Nick Thom, City Engineer 835 East 14th Street San Leandro, CA 94577 nthom@sanleandro.org 510-577-3431 With a copy to: City of San Leandro Department of Finance c/o Purchasing Agent 835 East 14th Street San Leandro, CA 94577 10.11 Professional Seal. Where applicable in the determination of the contract administrator, the first page of a technical report, first page of design specifications, and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal and Signature of Registered Professional with report/design responsibility," as in the following example. _________________________________________ <br />
The URL can be used to link to this page
Your browser does not support the video tag.