My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2019 0219
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0219
>
8G Consent 2019 0219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 6:36:31 PM
Creation date
2/13/2019 6:36:28 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/19/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
F. The contractor(s) shall be required to employ the quietest among alternative <br />equipment or to muffle/control noise from available equipment. <br />G. All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) Trucks <br />hauling construction materials shall be covered with tarpaulins or other effective <br />covers; 3) Streets surrounding demolition and construction sites shall be swept <br />at least once per day; and 4) Paving and planting shall be done as soon as <br />possible. City shall charge developer, and developer shall pay, for all costs of <br />sweeping city streets in the vicinity of the project as necessary to control dust <br />and spillage. <br />H. The property shall be secured during construction with a six (6) foot tall chain <br />link fence and any other security measures in accordance with <br />recommendation of the San Leandro Police Department. <br />1.Pest and vermin control shall be instituted prior to the demolition and <br />construction of the project. <br />VII. FIRE DEPARTMENT REQUIREMENTS <br />A. A Fire Protection system will be required for the project (all residences). <br />B. A Fire Alarm System meeting the requirements of monitoring will be required <br />for this project. <br />C. All emergency egress windows shall have the ability to achieve a rescue ladder <br />angle of 65 degrees. <br />D. Carbon monoxide detectors are requiredired in all units per the California Building <br />and Fire Code. <br />E. Smoke Alarm are required for per the California Building Code. <br />F. A Monument sign for address will be required for this project. <br />VIII. GENERAL CONDITIONS <br />A. All exterior mechanical equipment such as air conditioning/heating units and <br />radio/television antennas shall be screened from view so as not to be visible <br />from adjacent properties or streets to the satisfaction of the Zoning <br />Enforcement Official. This condition shall not apply to wireless cable receivers <br />that do not exceed three feet in diameter. <br />B. All garage doors shall be equipped with electronic remote controlled garage <br />door openers. <br />Agreement to Conditions November 2,2017 <br />PLN 17-0002 Page 8 of9
The URL can be used to link to this page
Your browser does not support the video tag.