My WebLink
|
Help
|
About
|
Sign Out
Home
10B Action 2019 0506
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0506
>
10B Action 2019 0506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 2:36:39 PM
Creation date
4/30/2019 3:19:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/6/2019
Retention
PERM
Document Relationships
Reso 2019-084
(Approved)
Path:
\City Clerk\City Council\Resolutions\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Bay Area Clean Water Agencies | City of San Leandro Final Report | 1 <br />Executive Summary <br />The City of San Leandro operates the City of San Leandro Water Pollution Control Plant (SLWPCP) <br />which discharges to South San Francisco Bay. The plant has an average dry weather flow (ADWF) <br />permitted capacity of 7.6 million gallons per day (mgd). <br />A summary of the flows and loads for the current conditions, optimization, sidestream and upgrade <br />strategies are presented in Table ES-1. Capital costs, operation and maintenance (O&M) costs and <br />unit costs were developed for each strategy. <br />Table ES-1. Summary of Costs and Load Reductions <br />Parameter1 Unit1 Current <br />Dry <br />Season <br />Current <br />Year <br />Round <br />Opt. <br />Dry <br />Season3 <br />Opt. <br />Year <br />Round3 <br />Level 2 <br />Dry <br />Season3 <br />Level 2 <br />Year <br />Round3 <br />Level 3 <br />Dry <br />Season3 <br />Level 3 <br />Year <br />Round3 <br />Side- <br />stream <br />Design Flow mgd -- -- 4.8 5.2 7.6 8.1 7.6 8.1 -- <br />Flow to Bay2 mgd 5.0 5.0 5.0 5.0 6.5 6.5 6.5 6.5 -- <br />Nutrients to Bay (Average)2 <br />Ammonia lb N/d 1,240 1,240 200 190 120 110 120 110 1,270 <br />TN lb N/d 1,240 1,240 1,040 970 690 650 520 320 1,300 <br />TP lb P/d 114 114 122 114 60 50 40 20 122 <br />Costs4,5 <br />Capital $ Mil -- -- 10.9 11.9 63 64 87 91 10.0 <br />O&M PV $ Mil -- -- 3.4 4.3 31 35 39 44 9.8 <br />Total PV $ Mil -- -- 14.3 16.2 94 99 126 135 19.8 <br />Unit Costs6 <br />Capital $/gpd -- -- 2.2 2.3 8.3 7.9 11.4 11.2 -- <br />Total PV $/gpd -- -- 3.0 3.1 12.4 12.2 16.5 16.6 -- <br />1. mgd = million gallons per day; TN = Total Nitrogen; TP = Total Phosphorus; O&M = Operations and Maintenance; PV = Present Value. <br />2. The current flows and loads to the Bay are the average annual 2015 BACWA Nutrient Reduction Study Group Annual Report (data from <br />7/2012-6/2015). The reported flows and loads for optimization, upgrades, and sidestream represent average projected loads discharged to the <br />Bay for the period of analysis (10-yr for optimization and 30-yr for upgrades and sidestream). <br />3. Dry Season = facilities sized for May 1 through September 30 loads but operate year round; year round = facilities sized for year round loads <br />and operated year round. The sidestream facilities are sized for a year round loads and operated year round. <br />4. Costs are referenced to the ENR SF CCI for November 2017 at 12,015. Costs do not include changes in solids handling or changes in energy <br />requirements in other unit processes. Level 3 costs are inclusive of facilities needed to meet Level 2. <br />5. PV is calculated based on a 2 percent discount rate for 30 years. <br />6. The unit load reduction cost was calculated by dividing the capital or total present value by the design flow. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.