My WebLink
|
Help
|
About
|
Sign Out
Home
10B Action 2019 0506
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0506
>
10B Action 2019 0506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 2:36:39 PM
Creation date
4/30/2019 3:19:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/6/2019
Retention
PERM
Document Relationships
Reso 2019-084
(Approved)
Path:
\City Clerk\City Council\Resolutions\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Bay Area Clean Water Agencies | City of San Leandro Final Report | 11 <br />Table 4-1. Optimization Strategy Project Elements <br />Capital Elements Operating Elements <br />Implement chemically enhanced primary treatment <br />(CEPT) <br />· Add metal salt chemical feed facilities <br />· Add polymer chemical feed facilities <br /> <br /> <br />· Operate the chemical feed facilities <br />Operate the aeration basins in series <br />· Replace the existing aeration basin overflow pipes <br />layout. The pipes would most likely require <br />replacement due to corrosion <br />· Modify a portion of the first train to operate as an <br />anoxic zone <br />· Add a blower to meet the additional demand <br />associated with nitrification <br /> <br />· Operate in a new mode that the operations staff will <br />need to get accustomed to <br />· Maintain the additional blower <br />Operate the aeration basins in step feed mode <br />· Add additional piping to facilitate feeding the <br />aeration basins along the length <br /> <br />· Operate in a new mode that the operations staff will <br />need to get accustomed to <br /> <br />Table 4-2 presents the estimated effluent nutrient loads for the optimization strategy as previously <br />described. The values presented for the current discharge loads and the discharge loads after <br />optimization represent the average for the period between 2016 and 2025. <br />Table 4-2. Projected Discharge Nitrogen and Phosphorus Loads for Optimization <br />Parameter Units NH4-N Dry <br />Season <br />NH4-N Year <br />Round <br />TN Dry <br />Season <br />TN Year <br />Round <br />TP Dry <br />Season <br />TP Year <br />Round <br />Current <br />Discharge1 <br />lb N or <br />P/d <br />1,340 1,340 1,340 1,340 122 122 <br />Discharge with <br />Opt. Strategy1 <br />lb N or <br />P/d <br />200 190 1,040 970 122 114 <br />Load Reduction2 lb N or <br />P/d <br />1,140 1,150 300 370 0 8 <br />Load Reduction2 % 85% 86% 23% 28% 0% 7% <br />Annual Load <br />Reduction <br />lb N or <br />P/yr <br />416,000 420,000 110,000 134,000 0 2,900 <br />1. The loads represent average projected loads discharged to the Bay for the period of analysis (10-yr for optimization). <br />2. As compared to Current Discharge (Note 1). <br />3. The average annual load reduction over the 10-year project duration. The calculation considers days with no discharge. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.