Laserfiche WebLink
Wastewater Capacity Charges Study Section 2 <br /> <br /> 2-3 <br />DRAFT Use of contents on this sheet is subject to the limitations specified at the end of this document. <br />The value of the wastewater system is allocated among flow, BOD and SS constituents to facilitate the <br />development of capacity charge unit costs. The unit costs can be used to develop capacity charges for <br />any new connection. The cost to construct the wastewater collection components of the wastewater <br />system are proportionate to flow. The cost to construct the wastewater treatment components of the <br />wastewater system are proportionate to flow, BOD and TSS. The allocation of the wastewater system <br />valuation is shown in Table 2-2. <br /> <br />Table 2-2. Allocation of Wastewater System Valuation <br /> <br /> <br />2.2 System Capacity <br />Values for the capacity of the wastewater system are based on design flow and loadings associated with <br />the average day maximum month. Values for flow, BOD and SS are shown below in Table 3-1. <br /> <br />Table 2-3. Wastewater System Capacity <br /> <br /> <br /> <br />Projected <br />Item 2018 2019 2020 2021 2022 2023 <br />Net Valuation $296,029,000 $311,264,000 $327,082,000 $343,505,000 $360,555,000 $378,255,000 <br />Asset Allocation <br />Allocation Percent <br />Flow 75.0% 75.0% 75.0% 75.0% 75.0% 75.0% <br />BOD 12.5% 12.5% 12.5% 12.5% 12.5% 12.5% <br />SS 12.5% 12.5% 12.5% 12.5% 12.5% 12.5% <br />Allocation $ <br />Flow $222,021,750 $233,448,000 $245,311,500 $257,628,750 $270,416,250 $283,691,250 <br />BOD $37,003,625 $38,908,000 $40,885,250 $42,938,125 $45,069,375 $47,281,875 <br />SS $37,003,625 $38,908,000 $40,885,250 $42,938,125 $45,069,375 $47,281,875 <br />Item 2018 2019 2020 2021 2022 2023 <br />Design Capacity [1] <br />Flow, gpd 10,600,000 10,600,000 10,600,000 10,600,000 10,600,000 10,600,000 <br />BOD, lbs/day 41,471 41,471 41,471 41,471 41,471 41,471 <br />SS, lbs/day 39,186 39,186 39,186 39,186 39,186 39,186 <br />Notes: <br />1. The design capacities for flow, BOD and SS were obtained from <br />Technical Memorandum No. 1 Flow and Loading Evaluti on dated February 2009. <br />Values are Average Day Maximum Month (ADMM) from Table 1.12, <br />Influent Flow and Loading Projections WPCP Rehabili tation Project.