Description
<br />Current Fee
<br />COMMUNITY DEVELOPMENT DEPARTMENT- Building Regulations Division (continued)
<br />to $10,000
<br />$184 for the first $5,000 plus $36.74 for each add'I $1,000
<br />or fraction thereof, to and includinO $10,000
<br />$10,001 and up
<br />$367 for the first $10,000 plus $12.25 for each additional
<br />11�qqq or fraction thereof over $10,000
<br />v) Residential 1 and 2 Family Re -roof
<br />a) Main dwelling roof
<br />$256 all sizes and materials
<br />b) Detached garages and accessory structures on same property as main dwelling and
<br />...............
<br />$82
<br />done at the same time as the main dwelling roof.
<br />vi) Inspection of the installation of an earthquake gas shutoff valve
<br />$32.40 with no Filing & Issuance Fee
<br />vii) Residential Seismic Retrofit projects using "Plan set A" (for one and two family
<br />...............
<br />$75 plus Filing and Issuance Fee and other miscellaneous
<br />residences)
<br />fees
<br />viii) Photovoltaic Systems
<br />a) Residential
<br />i) Up to 15kW
<br />$276
<br />---,ii) each additional <W over 15kW
<br />$15
<br />Commercial
<br />i) Up to 25kW
<br />$400
<br />---,ii) 26kW - 50kW
<br />$600
<br />,,,,,,,iii) each additional <W (51 <W - 2501<W)
<br />$7
<br />iv) each additional <W over 2501<W
<br />$5
<br />For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community Planning Fees, and
<br />othermandated fees shall not exceed amounts authorized via Government Code Section 66015.
<br />ix) Signs
<br />Sign permit fees are based on all signs being on the same property and on the same permit.
<br />a) 1st Non -energized sign attached to building.
<br />$103
<br />each additional sign thereafter:
<br />$52
<br />c) Pylon sign, energized or not, each:
<br />$218
<br />Monument sign, energized or not, each
<br />$163
<br />e) Relocation or alteration of any sign electronically or mechanically, but not including
<br />...............
<br />$82
<br />replacement of tubing, transformers and such parts subject to failure, or shop
<br />inspection by the local inspection department in lieu of a UL label (a local electrical
<br />inspection department label of approval shall be required), each
<br />x) Demolition
<br />a) Commercial/Residential Demolition up to 3,OOOSF
<br />$276
<br />Each Additional 1 O,OOOSF
<br />$184
<br />C. Plan Checking Fee
<br />Plan checking fee shall be paid at the time of application for a building permit. The plan
<br />checking fee is in addition to the building permit fee and shall be as follows
<br />i) Plan Check Fee, if applicable
<br />80% of building permit fee
<br />ii) For Master Plans (i.e. identical buildings built by the same builder on the same lot or in
<br />A full plan checking fee shall be paid for each Master Plan
<br />the same tract and for which building permits are issued at the same time)
<br />when more than one building will be built and one-third
<br />(33%) of the full plan checking fee shall be paid for each
<br />production phase building at time of application.
<br />-,"'I'll, ...............
<br />iii) Changes, revisions, or additions to plans previously checked $184 per hour, 1 hour minimum charge
<br />iv) Additional plan review after the first re -check $184 per hour, 1 hour minimum charge
<br />v) Alternate Methods and Materials $184 per hour, 1 hour minimum charge
<br />Reference 2019-20 PROPOSED FEES Explin for FY 201X20 Prop—d F-
<br />...............
<br />$191 for the first $ 5, 000 p I us $38.16 for each add'i $ 1, 000 o r fraction thereof,
<br />to and including $Iq,qqq
<br />iiiili
<br />r the first $10,000 plus $12.72 for each additional $1,000 or fraction
<br />all sizes and materials
<br />f- r,or to .—,n h.fged
<br />(ee proposed to remain unchefged
<br />(ee proposed to remain unchefged
<br />(ee proposed to remain unchefged
<br />(ee proposed to remain unchefged
<br />(ee proposed to remain unchefged
<br />
|