Laserfiche WebLink
Wastewater Capacity ll <br />Capacity Charges <br />Capacity charges are developed based on unit costs for flow, BOD and SS. The unit costs for each <br />component are the value of the system allocated to each component divided by the capacity in the <br />system for each component. <br />The unit costs for each capacity charge component are the value of the system allocated to each <br />component divided by the capacity in the system for each component. Allocation of wastewater system <br />valuation to each component and determination of the wastewater capacity were described in Section 2. <br />The development of unit costs for flow, BOD and SS based on those values are shown in the table below. <br />Item <br />2018 <br />2019 <br />2020 <br />Projected <br />2021 <br />2022 <br />2023 <br />Net System Valuation <br />Flow <br />$222,021,750 <br />$233,448,000 <br />$245,311,500 <br />$257,628,750 <br />$270,416,250 <br />$283,691,250 <br />BOD <br />37,003,625 <br />38,908,000 <br />40,885,250 <br />42,938,125 <br />45,069,375 <br />47,281,875 <br />TSS <br />37,003,625 <br />38,908,000 <br />40,885,250 <br />42,938,125 <br />45,069,375 <br />47,281,875 <br />Total <br />$296,029,000 <br />$311,264,000 <br />$327,082,000 <br />$343,505,000 <br />$360,555,000 <br />$378,255,000 <br />System Capacity <br />Flow, gpd <br />10,600,000 <br />10,600,000 <br />10,600,000 <br />10,600,000 <br />10,600,000 <br />10,600,000 <br />BOD, lbs/day <br />41,471 <br />41,471 <br />41,471 <br />41,471 <br />41,471 <br />41,471 <br />SS, Ibs/day <br />39,186 <br />39,186 <br />39,186 <br />39,186 <br />39,186 <br />39,186 <br />Unit Costs of Capacity <br />Flow, $/gallon <br />$20.95 <br />$22.02 <br />$23.14 <br />$24.30 <br />$25.51 <br />$26.76 <br />BOD, $/pound (rounded to $1) <br />$892 <br />$938 <br />$986 <br />$1,035 <br />$1,087 <br />$1,140 <br />SS, $/pound (rounded to $1) <br />$944 <br />$993 <br />$1,043 <br />$1,096 <br />$1,150 <br />$1,207 <br />Using the unit costs for flow, BOD and SS, the capacity charge for any new connection may be <br />calculated. <br />3-1 <br />DH�'IIVI sc c4 ;oi'dci'dscin this -Ihcet'i�b-11hI ;lNj:, hc III IIIGflI,il. p:e;Hci I fl lN ! cind c4, h'ir000lIIIIcin I. <br />