Laserfiche WebLink
description shall be prepared for this dedication and must be recorded prior to <br />Building Permit issuance. <br />E. The proposed storm drain inlet at the northwest corner of Doolittle Drive and <br />Marina Boulevard shall be installed per City of San Leandro Standard Plan <br />Dwg. 204, Case 3101. A United Storm Water trash capture device shall be <br />installed in this storm drain inlet. <br />F. The proposed storm drain manhole in Doolittle Drive will require a separate <br />permit from the County of Alameda. The manhole shall be installed per the <br />County of Alameda standards. <br />G. The project proposes to utilize pervious pavement to decrease the impervious <br />surface to below the Regulated Project threshold, as defined in Provision C.3.b <br />of the San Francisco Bay Region Municipal Regional Stormwater NPDES <br />Permit (Order No. R2-2015-0049, NPDES Permit No. CAS612008, adopted <br />11/19/2015). The pervious paving must be designed in accordance with <br />Section 6.6 of the Alameda County Clean Water Program Guidebook. The <br />pervious storage material must be sufficient to hold the MRP section C.3.d <br />volume of rainfall runoff as evidenced by calculations. The calculations must <br />be prepared according to the Volume Hydraulic Design Basis, Flow Hydraulic <br />Design Basis, or Combination Flow and Volume Design Basis. <br />H. All proposed driveways, sidewalk, curb and gutter shall be installed per the City <br />of San Leandro Standard Plan Dwgs. 100, 102 & 104, Case 3101. <br />Any work within the Public Right -of -Way shall require an encroachment permit <br />from the City of San Leandro Engineering and Transportation Department. <br />J. The Development Fee for Street Improvements has been analyzed for this <br />project. Since the new project is constructing a building of the same square <br />footage as the previous building, there will be no DFSI fee for this project at this <br />time. This assumes the new building will be used for retail as the previous <br />building was. In the future, when Tenant Improvement (TI) applications come <br />in, if the proposed use for a particular space is different than a retail use, the <br />DFSI fee will be re -analyzed, and a fee may be due. <br />K. The project parcel abuts Doolittle Drive and Marina Boulevard, which are <br />Underground Utility Districts. Projects within these Underground Utility Districts <br />are required to relocate the existing overhead utilities (electric, cable, <br />telephone, etc.) into underground facilities, or pay an in -lieu fee for the required <br />undergrounding. However, the last paragraph of Section G of the Underground <br />Utility District Master Plan states that "a conversion fee shall not be imposed in <br />connection with work or construction necessary to repair or replace in kind <br />facilities or improvements damaged by fire, earthquake, flood or other natural <br />disasters." Since this project will be reconstructing retail space destroyed by a <br />Agreement to Conditions April 4, 2019 <br />PLN 17-0059 Page 9 of 14 <br />