My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2019092776
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2019
>
Inst 2019092776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:05:42 AM
Creation date
6/3/2019 5:34:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/17/2019
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L. Knox Boxes maybe required in multiple locations (key switches for electronic <br />gates, manual boxes for gates and store fronts. <br />M. An Illuminated Address shall be visible form the street on a contrasting <br />background. <br />VL BUILDING DEPARTMENT REQUIREMENTS <br />A. Calculations are required for adequacy of ventilations due to mixed Type <br />Occupancies. <br />VII. WATER POLLUTION CONTROL PLANT REQUIREMENTS <br />A. Plans do not indicate a new sewer lateral. This property will be subject to a sewer <br />connection fee based final square footage of each type of building use. <br />VIII. CONSTRUCTION PROVISIONS <br />A. Pest and vermin control shall be instituted prior to the demolition and construction <br />of the project. <br />B. During construction the following high standards for sanitation are required: Garbage <br />cans, construction dumpsters, and debris piles shall be removed on a minimum <br />weekly basis. All food related trash items such as wrappers, cans, bottles, and food <br />scraps shall be disposed of in closed containers only and shall be regularly removed <br />from the site. At no time shall debris remain on site unattended within the front yard <br />setback of the property. Inspections will be conducted as part of the regular <br />construction compliance, to ensure compliance of the Applicant and contractors with <br />this requirement. <br />C. Construction activity shall not commence prior to 7:00 a.m. and shall cease by 7:00 <br />p.m. Monday through Friday, and construction activity shall not commence prior to <br />9:00 a.m. and shall cease by 5:00 p.m. on Saturday. No construction is permitted on <br />Federal holidays or Sundays. As provided in the City of San Leandro's Noise <br />Ordinance (ORDINANCE NO. 2003-005), "construction" shall mean any site <br />preparation, assembly, erection, substantial repair, alteration, demolition or similar <br />action, for or on any private property, public or private right-of-way, streets, <br />structures, utilities, facilities, or other similar property. Construction activities carried <br />on in violation of the Noise Ordinance may be enforced as provided in Section 4-11- <br />1130, and may also be enforced by issuance of a stop work order and/or revocation <br />of any or all permits issued for such construction activity. Procedures with the <br />highest noise potential shall be scheduled for daylight hours, when ambient noise <br />levels are highest. The contractor(s) shall be required to employ the quietest among <br />alternative equipment or to muffle/control noise from available equipment. <br />D. Construction activity shall not create dust, noise or safety hazards for adjacent <br />residents and properties. Dirt and mud shall not be tracked onto Marina Blvd. from <br />the project site during construction. Standard construction dust control procedures, <br />Agreement to Conditions May 2, 2019 <br />PLN 18-0086 Page 9 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.