My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2019092776
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2019
>
Inst 2019092776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:05:42 AM
Creation date
6/3/2019 5:34:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/17/2019
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br />PLN18-0086 <br />620-754 Marina Blvd. <br />Assessor's Parcel Numbers 75-105-12-01, 75-105-12-02, 75-105-13-7, 75-105-13-9 <br />AND 75-105-14-2 <br />Redevelopment of a Mazda Dealership — Taz Harvey (Property Owner) <br />I. COMPLIANCE WITH APPROVED PLANS <br />A. The project shall comply with Exhibits A through W, except as hereinafter <br />modified. Exhibits are on file at the City of San Leandro, Community Development <br />Department, 835 East 14th Street, San Leandro, California, 94577. <br />Exhibit A <br />— Cover Sheet (C 1) <br />Exhibit B <br />— Preliminary Site Plan (C2) <br />Exhibit C <br />— Stormwater Quality Plan (C3) <br />Exhibit D <br />— Stormwater Quality Plan (C4) <br />Exhibit E — <br />Grading and Drainage Plan (C5) <br />Exhibit F — <br />Sanitary Sewer and Composite Utility Plan (C6) <br />Exhibit G <br />— Storm Drain and Composite Utility Plan (C7) <br />Exhibit H <br />— Truck Turning Analysis Plan (0) <br />Exhibit I — <br />Architectural Cover Sheet (G0.00) <br />Exhibit J — <br />Overall Floor Plan (A3.00) <br />Exhibit K <br />— Overall Existing Floor Plan (A3.01) <br />Exhibit L <br />— Proposed Floor Plan Building A (A3.02) <br />Exhibit M <br />— Proposed Floor Plan Building B (1 of 2) (A3.03) <br />Exhibit N <br />— Proposed Overall Roof Plan (A5.00) <br />Exhibit O <br />—Overall Existing Roof Plan (A5.01) <br />Exhibit P <br />— Proposed Exterior Elevations (A6.00) <br />Exhibit Q <br />— Proposed Exterior Elevations (A6.01) <br />Exhibit R <br />— Exterior Elevations - Existing (A6.03) <br />Exhibit S — <br />Exterior Elevations - Existing (A6.04) <br />Exhibit T — Building Sections (A7.00) <br />Exhibit U — Life Safety Plan (G2.00) <br />Exhibit V — Planting Plan (L3.1) <br />Exhibit W — Photometric Plan (E 1) <br />B. The Applicant and/or Property Owner shall be responsible for assuring that any <br />successor in interest who assumes responsibility for this zoning approval is <br />informed of its terms and conditions. <br />C. Construction shall commence within one (1) year following Zoning Enforcement <br />Official approval and shall be substantially completed one (1) year thereafter. For <br />the purpose of compliance with this condition, commencement of construction shall <br />be defined as a grading permit or building permit has been issued. <br />Agreement to Conditions May 2, 2019 <br />PLN 18-0086 Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.