My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2019092776
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2019
>
Inst 2019092776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:05:42 AM
Creation date
6/3/2019 5:34:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/17/2019
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The potable water network that serves the site is owned and operated by East Bay <br />Municipal Utility District (EBMUD). Please contact EBMUD at 866-403-2683 <br />for more information about connections and water service. <br />C. The applicant shall locate all new electric and communications utilities serving the <br />site underground. <br />D. The Building Permit plans must indicate that proposed storm drain inlets (both <br />onsite and offsite) shall be marked "NO DUMPING, DRAINS TO BAY" as per <br />the City of San Leandro Standard Plan Dwg. No. 204. <br />E. Building Permit plans must include a signing and striping plan showing STOP <br />control at both driveways, red painted curbs at required fire lanes, and travel <br />direction pavement arrows. <br />F. Submit a photometric lighting plan that shows sufficient illumination for the site <br />including the trash enclosures and the parking lots. <br />PERMITS: <br />A. The applicant shall obtain an Encroachment Permit from the Engineering and <br />Transportation Department for any work within public right-of-way. Contractors <br />must be properly licensed, have a valid Business License, and submit proof of <br />insurance. Applicable fees/deposits must be paid. <br />B. A Grading Permit will be necessary for the project. The requirements for said <br />permit are indicated in San Leandro Municipal Code §7-12. The permit will be <br />issued prior to or concurrent with the Building Permit. The geotechnical engineer <br />of record shall certify that the design of site improvements conforms to <br />recommendations from the Geotechnical Investigation. <br />C. The site will be subject to a Construction General Permit according to the National <br />Pollutant Discharge Elimination System (NPDES) General Permit No. <br />CAS000002. The general permit is applicable to construction sites that disturb on <br />or more acres of land surface. The applicant will be required to register the project <br />with the State Water Board's Storm Water Multi -Application and Report Tracking <br />System (SMARTS) website. A Qualified SWPPP Developer (QSD) and a <br />Qualified SWPPP Practitioner (QSP) must be responsible for permit compliance. <br />The SMARTS system will generate a Waste Dischargers Identification (WDID) <br />number which must be printed on the grading and/or erosion control plans. <br />MAINTENANCE: <br />A. No automotive repair, maintenance, servicing work, or use of pneumatic lifts shall <br />be conducted outside the existing buildings. <br />Agreement to Conditions May 2, 2019 <br />PLN 18-0086 Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.