Laserfiche WebLink
B. The potable water network that serves the site is owned and operated by East Bay <br />Municipal Utility District (EBMUD). Please contact EBMUD at 866-403-2683 <br />for more information about connections and water service. <br />C. The applicant shall locate all new electric and communications utilities serving the <br />site underground. <br />D. The Building Permit plans must indicate that proposed storm drain inlets (both <br />onsite and offsite) shall be marked "NO DUMPING, DRAINS TO BAY" as per <br />the City of San Leandro Standard Plan Dwg. No. 204. <br />E. Building Permit plans must include a signing and striping plan showing STOP <br />control at both driveways, red painted curbs at required fire lanes, and travel <br />direction pavement arrows. <br />F. Submit a photometric lighting plan that shows sufficient illumination for the site <br />including the trash enclosures and the parking lots. <br />PERMITS: <br />A. The applicant shall obtain an Encroachment Permit from the Engineering and <br />Transportation Department for any work within public right-of-way. Contractors <br />must be properly licensed, have a valid Business License, and submit proof of <br />insurance. Applicable fees/deposits must be paid. <br />B. A Grading Permit will be necessary for the project. The requirements for said <br />permit are indicated in San Leandro Municipal Code §7-12. The permit will be <br />issued prior to or concurrent with the Building Permit. The geotechnical engineer <br />of record shall certify that the design of site improvements conforms to <br />recommendations from the Geotechnical Investigation. <br />C. The site will be subject to a Construction General Permit according to the National <br />Pollutant Discharge Elimination System (NPDES) General Permit No. <br />CAS000002. The general permit is applicable to construction sites that disturb on <br />or more acres of land surface. The applicant will be required to register the project <br />with the State Water Board's Storm Water Multi -Application and Report Tracking <br />System (SMARTS) website. A Qualified SWPPP Developer (QSD) and a <br />Qualified SWPPP Practitioner (QSP) must be responsible for permit compliance. <br />The SMARTS system will generate a Waste Dischargers Identification (WDID) <br />number which must be printed on the grading and/or erosion control plans. <br />MAINTENANCE: <br />A. No automotive repair, maintenance, servicing work, or use of pneumatic lifts shall <br />be conducted outside the existing buildings. <br />Agreement to Conditions May 2, 2019 <br />PLN 18-0086 Page 6 of 12 <br />