My WebLink
|
Help
|
About
|
Sign Out
Home
8J Consent Calendar 2019 0701
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0701
>
8J Consent Calendar 2019 0701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 3:17:19 PM
Creation date
6/25/2019 6:08:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/1/2019
Retention
PERM
Document Relationships
Ord 2019-012 PAD
(Approved)
Path:
\City Clerk\City Council\Ordinances\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 19-367 <br />(d) “Building” means a structure with a roof and walls standing more or less permanently in one <br />place. Buildings are intended for human habitation or occupancy. <br />(e) “Demolition” means the wrecking, razing, or tearing down of any structure. This definition is <br />intended to be consistent with the demolition activities undertaken by contractors with a C-21 <br />Building Moving/Demolition Contractor’s License. <br />(f) “DTSC” means the State of California Department of Toxic Substances Control. <br />(g) “EPA” means the United States Environmental Protection Agency. <br />(h) “PCBs” means polychlorinated biphenyls. <br />(i) “PCBs in Priority Building Materials Screening Assessment” means the two-step process used <br />to 1) determine whether the building proposed for demolition is high priority for PCBs-containing <br />building materials based on the structure age, use, and construction; and if so 2) determine the <br />concentrations (if any) of PCBs in Priority Building Materials revealed through existing information <br />or representative sampling and chemical analysis of the Priority Building Materials in the building. <br />Directions for this process are provided in the PCBs in the Priority Building Materials Screening <br />Assessment Applicant Package. <br />(j) “Priority Building Materials” means the following: <br />a. Caulking: e.g., around windows and doors, at structure walkway interfaces, and in <br />expansion joints; <br />b. Thermal/Fiberglass Insulation: e.g., around HVAC systems, around heaters, around boilers, <br />around heated transfer piping, and inside walls or crawl spaces; <br />c. Adhesive/Mastic: e.g., below carpet and floor tiles, under roofing materials, and under <br />flashing; and <br />d. Rubber Window Gaskets: e.g., used in lieu of caulking to seal around windows in <br />steel-framed buildings. <br />(k) “Priority Building Materials Screening Assessment Applicant Package” (Applicant Package) <br />means a document package that includes an overview of the screening process, Applicant <br />instructions, a process flow chart, a screening assessment form, and the Protocol for Evaluating <br />Priority PCBs-Containing Materials before Building Demolition (BASMAA 2018, prepared for the <br />Bay Area Stormwater Management Agencies Association, August 2018). <br />(l) “Regional Water Board” means the California Regional Water Quality Control Board, San <br />Francisco Bay Region. <br />(m) “Remodel” means to make significant finish and/or structural changes that increase utility and <br />appeal through complete replacement and/or expansion. A removed area reflects fundamental <br />changes that include multiple alterations. These alterations may include some or all of the <br />following: replacement of a major component (cabinet(s), bathtub, or bathroom tile), relocation of <br />plumbing/gas fixtures/appliances, significant structural alterations (relocating walls, and/or the <br />addition of square footage). <br />3-23-300. Applicability <br />This Article applies to Applicants for buildings constructed or remodeled from January 1, 1950 to <br />December 31, 1980. <br />3-23-400. Exemptions <br />Applications for remodeling, partial building, wood framed structure, and single-family residence <br />demolition projects are exempt. <br />3-23-500. PCBs in Priority Building Materials Screening Assessment <br />Every Applicant for a building demolition permit shall conduct a PCBs in Priority Building <br />Materials Screening Assessment, a two-step process used to <br />a. determine whether the building proposed for demolition is high priority for PCBs- <br />Page 3 City of San Leandro Printed on 6/25/2019 <br />238
The URL can be used to link to this page
Your browser does not support the video tag.