My WebLink
|
Help
|
About
|
Sign Out
Home
8J Consent Calendar 2019 0701
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0701
>
8J Consent Calendar 2019 0701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 3:17:19 PM
Creation date
6/25/2019 6:08:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/1/2019
Retention
PERM
Document Relationships
Ord 2019-012 PAD
(Approved)
Path:
\City Clerk\City Council\Ordinances\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Download electronic document
View images
View plain text
File Number: 19-367 <br />Protocol for Assessing Priority PCBs-Containing Materials before Building Demolition and the <br />analytical laboratory results. <br />4. For each Priority Building Material present with a PCBs concentration equal to or greater <br />than 50 ppm, the approximate amount (linear feet or square feet) of that material in the building <br />(see Applicant Package for more details). <br />5. Applicant’s certification of the accuracy of the information submitted. <br />(b) The Building Division of the Community Development Department shall specify a format or <br />guidance for the submission of the information. <br />3-23-900. Recordkeeping <br />Applicants conducting a building demolition project must maintain documentation of the results of <br />the PCBs in Priority Building Materials Screening Assessment for a minimum of five years after <br />submittal. <br />3-23-1000. Obligation to Notify the City of San Leandro of Changes <br />The Applicant shall submit written notifications documenting any changes in the information <br />submitted in compliance with this Article. <br />The Applicant shall submit the revised information to the Building Division of the Community <br />Development Department when changes in project conditions affect the information submitted <br />with the permit application. <br />3-23-1100. Liability <br />The Applicant is responsible for safely and legally complying with the requirements of this Article. <br />Neither the issuance of a permit under the requirements of Chapter 7-5, Article 1, Section 105.1 <br />et seq., nor the compliance with the requirements of this Article or with any condition imposed by <br />the issuing authority, shall relieve any person from responsibility for damage to persons or <br />property resulting therefrom, or as otherwise imposed by law, nor impose any liability upon the <br />City of San Leandro for damages to persons or property. <br />3-23-1200. Enforcement <br />Failure to submit the information required in this Article or submittal of false information will result <br />in enforcement under Chapter 7-5, Article 1, Section 104.1 et seq. <br />3-23-1300. Fees <br />In addition to the fees required under Chapter 7-5, Article 1, Section 105.1 et seq., all Applicants <br />subject to this Article shall deposit funds with the City of San Leandro and pay a fee sufficient to <br />reimburse the City of San Leandro’s costs for staff time required to implement this Article (i.e., to <br />compensate specifically for municipal staff time related to implementing a new program to <br />manage PCBs-containing building materials during demolition in compliance with MRP Provision <br />C.12.f., and not for any other purpose). <br />3-23-1400. City of San Leandro Projects <br />City of San Leandro departments shall comply with all the requirements of this Article. <br />SECTION 3. SEVERABILITY CLAUSE <br />If any section or provision of this Ordinance is to any extent invalid, illegal, or incapable of being <br />enforced, such section or provision shall be excluded to the extent of such invalidity, illegality, or <br />unenforceability; all other sections or provisions hereof shall remain in full force and effect. <br />SECTION 4. Effective Date <br />Following adoption by a vote of the City Council, this Ordinance shall be effective immediately <br />upon adoption pursuant to San Leandro Municipal Code Title 1, Chapter 1-1, Article 3. The City <br />Clerk shall certify as to the adoption of this Ordinance and shall cause it to be published within <br />fifteen (15) days of the adoption and shall post a certified copy of this Ordinance, including the <br />Page 5 City of San Leandro Printed on 6/25/2019 <br />240
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).