My WebLink
|
Help
|
About
|
Sign Out
Home
5C Public Hearings 2019 0715
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0715
>
5C Public Hearings 2019 0715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 10:19:38 PM
Creation date
7/9/2019 10:18:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/15/2019
Retention
PERM
Document Relationships
Reso 2019-123
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Table of Contents Wastewater Capacity Charges Study <br />iv <br />Use of contents on this sheet is subject to the limitations specified at the end of this document. <br />List of Figures <br />Figure 4-1. Single Family Capacity Charge Survey........................................................................................3-4 <br />List of Tables <br />Table ES-1. Current and Recommended Wastewater Unit Costs of Capacity................................................1 <br />Table ES-2. Capacity Charges Based on Current and Recommended Unit Costs of Capacity .....................2 <br />Table 1-1. Current Wastewater Capacity Charges........................................................................................1-2 <br />Table 2-1. Summary of Wastewater System Valuation................................................................................2-2 <br />Table 2-2. Allocation of Wastewater System Valuation................................................................................2-3 <br />Table 2-3. Wastewater System Capacity.......................................................................................................2-3 <br />Table 3-1. Development of Unit Costs for Flow, BOD and SS......................................................................3-1 <br />Table 3-2. Residential Capacity Charges.......................................................................................................3-2 <br />Table 3-3. Nonresidential Capacity Charges.................................................................................................3-3 <br />List of Abbreviations <br />BOD Biochemical Oxygen Demand <br />City City of San Leandro <br />CCI Construction Cost Index <br />CIP Capital Improvement Program <br />EDU Equivalent Dwelling Unit <br />ENR Engineering News Record <br />FY Fiscal year (July 1 to June 30) <br />FY19 July 1, 2018 to June 30, 2019 <br />gpd Gallons per Day <br />HCF Hundred Cubic Feet (equal to ~ 748.1 gallons) <br />NPDES National Pollutant Discharge Elimination System <br />O&M Operation and maintenance <br />R&R Renewal and Replacement <br />SSC Sewer Service Charge <br />SS Suspended Solids <br />163
The URL can be used to link to this page
Your browser does not support the video tag.