File Number: 19-257 <br />costs increased significantly since the original project scope and estimate were prepared, and 2) <br />The cost to replace the existing facility would be roughly equal to remodeling the facility as <br />originally envisioned because of the extent of repairs needed to meet current code requirements. <br />The current project will replace the existing pool facility including the demolition of the existing <br />facility, the construction of a 75 ft by 62 ft swimming pool, the construction of three buildings <br />(consisting of pool equipment building, staff office and locker room), shade structures and four <br />picnic areas. <br />The purpose of Amendment No. 1 is to cover the additional effort required to design, collect, <br />analyze and submit data required for LEED Silver certification of the Farrelly Pool facility, <br />including civil engineering, mechanical, electrical and landscape construction items. <br />Analysis <br />Staff recommends approval of Amendment No. 1 to the CSA with Glass Architects. Approval of <br />this Amendment will allow the consultant to provide services related to LEED including design, <br />collection, evaluation and submission of all required documents to the United States Green <br />Building Council to obtain LEED Silver certification for the project. In addition, incorporation of <br />LEED in the project complies with San Leandro Municipal Code Title 3, Chapter 3-19. <br />Amendment No. 1 will increase the CSA with Glass Architects by $140,640 for a total contract <br />amount of $417,767, an increase of 51% above the original contract amount. <br />Current Agency Policies <br />·Maintain and enhance San Leandro’s infrastructure <br />·Support and implement programs, activities and strengthen communication that enhances <br />the quality of life and wellness, celebrates the arts and diversity and promotes civic pride <br />Previous Actions <br />·On April 16th, 2018 by Resolution 2018-031, the City Council approved the original design <br />contract with Glass Architects for $277,127, and authorized cumulative change orders up <br />to 25% ($69,282) of the original contract amount. <br />·On April 22, 2019 by Resolution 2019-077, CC awarded a $134,185 Construction <br />Contract to Demolition Services and Grading, Incorporated for the Farrelly Pool <br />Replacement - Demolition Phase, Project No. 2018.3420; to Authorize the City Manager <br />to Negotiate and Approve Individual Change Orders Up to 5% of the Original Contract <br />Amount; to Authorize the City Manager to Negotiate and Approve Change Orders Up to a <br />Cumulative Value of 25% of the Original Contract Amount; <br />·On April 22, 2019 by Resolution 2019-078, CC and to Authorize the City Manager to <br />Execute a Memorandum of Understanding Between the San Leandro Unified School <br />District and the City of San Leandro for the Construction of the Farrelly Pool Replacement. <br />Committee Review and Actions <br />Page 2 City of San Leandro Printed on 7/9/2019 <br />295