My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2019 0715
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0715
>
8D Consent 2019 0715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 10:20:26 PM
Creation date
7/9/2019 10:20:22 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/15/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Amendment No. 1 to <br />Consulting Services Agreement between City of San Leandro and 04/29/2019 <br />Glass Architects for the Farrelly Pool Replacement Page 2 of 4 <br />• Support Development of Innovation Credit Documentation (if any such credits are identified and <br />attempted) <br />• Prepare and submit Design Phase LEED Documentation to USGBC <br />• Respond to any additional credit documentation requested and resubmit to USGBC as needed. <br /> <br />Construction Phase <br />Consultant will provide consulting and oversight during the Construction Phase to help ensure <br />implementation of sustainable design strategies and achievement of LEED credits, including the <br />following tasks and deliverables: <br />• Coordinate with the Owner’s Commissioning Agent and participate in a LEED construction kick- <br />off meeting to clarify responsibilities of the contractor and major subcontractors <br />• Track and address design team documentation responsibilities during the Construction Phase. <br />• Review, comment, and approve/disapprove contractor LEED submittals <br />• Work closely with the project team, especially the contractor and major subcontractors, to <br />oversee ongoing performance and track compliance with LEED requirements. <br />• Obtain the contractor’s and subcontractor’s Construction Phase LEED documentation, <br />• Assemble and complete all LEED credit documentation online during the project construction <br /> <br />Close-Out Phase <br />Consultant will prepare the final LEED documents for submittal to the USGBC for review and <br />certification. Consultant to review the Preliminary Response received from the USGBC and <br />coordinate with the design and construction team in preparing any materials necessary for re- <br />submittal to the USGBC, including the following: <br />• Final LEED Documentation <br />• Response to USGBC Preliminary LEED Review <br />• Communication with USGBC and Acceptance of Final LEED Certification <br /> <br /> <br />300
The URL can be used to link to this page
Your browser does not support the video tag.