My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2019 0715
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0715
>
8H Consent 2019 0715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 10:21:07 PM
Creation date
7/9/2019 10:20:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/15/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Base Project Amount: <br />115 Mason Circle, Suite B <br />Concord, CA 94520 <br />Phone: 925-459-9200 Fax: 925-459-9220 <br />Per the customers request Matrix HG Inc. proposes to provide the labor, material and equipment for the replacement <br />of one (1) existing Raypak pool boiler with one (1) new Lochinvar indoor pool boiler M# CPN1442 with Cupro- <br />nickel Heat Exchanger as per the following scope of work. <br />Scope of Work: <br />* Perform preliminary site inspection with mechanical engineer <br />* Provide Mechanical engineered drawings with title 24 calculations <br />* Pull permits from the city of San Leandro <br />* Isolate and lockout / tagout equipment for safety and removal. <br />* Disconnect electrical and hot water pipe from the existing boiler. <br />* Remove the existing boiler with equipment rack and dispose of properly. <br />* Rig in and install one (1) new Lochinvar boiler of equivalent capacity and set on existing concrete pad. <br />* Furnish and install new piping as needed to connect the new boiler pipe connections to the existing hot <br /> water and gas points of connection. <br />* Reconnect the existing electrical to the new boiler making minor modifications as needed. <br />* Add new duct and flue to connect the new boiler to the existing venting points <br />* Start up and test operation of system. <br />* Provide customer close out documents and set of drawings <br />Clarifications: <br />-This boiler comes with a standard one year parts and labor warranty. <br /> -Equipment has a lead time of 6 to 8 weeks once ordered after permits are acquired. <br />-All permit and special inspection fees are the responsibility of the client, and are 100% reimbursable to Matrix <br />should Matrix pay fees <br />The client should carry an allowance for permit fees of 5% of the job cost <br />The client should carry an allowance for special inspections of $1000 <br />Exclusions: <br />Overtime, permits, structural engineering and upgrades, electrical upgrades, hazardous material removal, source <br />testing, any unforeseen conditions requiring upgrades/repairs/modifications or replacement, repairs to existing <br />equipment and anything other than noted above. <br />66,296$ <br />Base Scope of Work <br />SCOPE OF SERVICES <br />3 of 8382
The URL can be used to link to this page
Your browser does not support the video tag.