My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent 2019 0715
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0715
>
8K Consent 2019 0715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 10:21:48 PM
Creation date
7/9/2019 10:21:23 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/15/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised 06/25/2019 <br />Ojo Technology for Security Camera Upgrade & Configuration Exhibit B – Page 2 of 2 <br />This proposal covers only the direct costs described above. Should other conditions change to our base contract (e.g. <br />time of completion, schedule, sequence of work, etc.) as a result of this revision, we reserve the right to re-quote this <br />proposal when these additional costs can be determined. <br /> <br />Exclusions & Clarifications: <br />1. CMAS Terms and Conditions Apply <br />2. Assumes PoE switches and / or midspan PoE injectors shall be provided by others <br />3. Assumes electrical circuits (if required), shall be provided by others <br />4. Assumes UPS power shall be provided by others <br />5. Assumes use of existing server, or server shall be provided by others <br />6. Assumes viewing workstation exists or shall be provided by others <br />7. Assumes use of existing equipment rack, or rack shall be provided by others <br />8. Assumes the City will install the traffic light cameras through Public Works. <br />9. Assumes The City will remove the 11th Samsung Multi Image camera that was used as a <br />test and hand it to the installers along with the PoE injector. <br />10. Assumes The City will re-install the Mobitix camera that was taken down for the test of <br />the Samsung Multi Image camera mentioned above. <br />11. Prevailing wage not included <br />12. Bond not included <br /> <br /> <br /> <br />• Alameda County Small, Local, Emerging Business (SLEB): # 10-00193 <br />• California Small Business Certification: #1064041 <br />• DBE Certification #: 39125DIR #: 1000001115 <br />• C-7 CA Contractors License #: 891252 <br /> <br />California Multiple Award Schedules (CMAS) <br /> Milestone CMAS - 3-17-84-0022S <br /> Samsung CMA – 3-16-84-0022K <br /> Professional Services: 3-19-70-2890G <br /> <br /> <br />453
The URL can be used to link to this page
Your browser does not support the video tag.