Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised 06/25/2019 <br />Columbia Electric, Inc. for Intersection Camera Installation Exhibit A – Page 1 of 1 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />1. Replace eleven (11) cameras at intersections located through the City; <br />2. Connect cameras to Ethernet cabling and adjust, as requested by Staff during installation, to <br />ensure proper viewing angles and coverage <br />3. Pull new Cat6 Ethernet cable in locations specified, using existing coax cable as a pull-rope to <br />install new cabling <br />4. Check power at each site; pull new power circuit to the camera, where needed. <br /> <br /> <br /> <br />Location Camera <br />Type Monitoring Street Pull <br />CAT6 <br />Bancroft Ave & Estudillo Ave CCTV Bancroft Ave (north leg) No <br />Davis St & Orchard Ave CCTV Davis St (west leg) No <br />Davis St & San Leandro Blvd CCTV Intersection No <br />E 14th St & Davis St & Callan Ave CCTV E 14th St (north leg) No <br />Hesperian Blvd & Springlake Dr CCTV Hesperian Blvd (north leg) No <br />E 14th St & San Leandro Blvd CCTV E 14th St (north leg) No <br />E 14th St & Hesperian Blvd & Bancroft Ave CCTV E 14th St (north leg) Yes* <br />Marina Blvd & Teagarden St CCTV Marina Blvd (west leg) Yes* <br />Marina Blvd & Merced St CCTV Marina Blvd (east leg) Yes* <br />Hesperian Blvd & Halcyon Dr & Fairmont Dr CCTV Hesperian Blvd (south <br />leg) Yes* <br />Washington Ave & Springlake Dr & Heather Glenn <br />Ln CCTV Washington Ave (south <br />leg) Yes* <br /> <br /> <br /> <br />*THE EXISTING CABLE / WIRE CAN BE USED AS A PULL ROPE TO INSTALL THE NEW CABLING. <br /> <br />473