My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2019 NP SA Monterey Mechanical #3550
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2019
>
Agmt 2019 NP SA Monterey Mechanical #3550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:28:07 PM
Creation date
7/11/2019 5:23:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/6/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to complying with all other safety regulations, Contractor shall abide by any and <br />all other City requirements contained in any specifications, special conditions or manuals, <br />which shall be made available by City upon request. <br />Contractor shall provide and maintain all necessary safety equipment such as fences, <br />barriers, signs, lights, walkways, guards, and fire prevention and fire -fighting equipment <br />and shall take such other action as is required to fulfill its obligations under this section. <br />is the intent of the City to provide a safe working environment under normal conditions. <br />CONTRACTOR IS ADVISED THAT CITY'S OPERATIONS AND PROPERTY ARE <br />INHERENTLY HAZARDOUS BECAUSE OF CONDITIONS SUCH AS CONFINED <br />SPACES, POTENTIALLY EXPLOSIVE ATMOSPHERES, AND POSSIBLE EXPOSURE <br />TO PATHOGENS. <br />Contractor shall maintain all portions of the jobsite in a neat, clean, and sanitary condition <br />at all times. If required by the City, toilets shall be furnished by Contractor where needed <br />for use of its employees and their use shall be strictly enforced. Contractor shall not use <br />the City's existing sanitary facilities, unless previously authorized by the City. <br />Contractor shall keep adequate first aid facilities and supplies available and instruction in <br />first aid for its employees shall be given. <br />City reserves the right to require that Contractor bring onto the project or engage the <br />services of a licensed safety engineer at any time during the term of this Agreement. If <br />Contractor does not have a licensed safety engineer on staff, then City may require that <br />Contractor engage a subcontractor or subconsultant as the project's safety engineer. <br />Contractor shall bear all costs in connection with meeting the requirements of this section. <br />Section 4. INSURANCE REQUIREMENTS. Before fully executing this Agreement, Contractor, at its <br />own cost and expense, unless otherwise specified below, shall procure the types and amounts of insurance <br />listed below against claims for injuries to persons or damages to property that may arise from or in <br />connection with the performance of the work hereunder by the Contractor and its agents, representatives, <br />employees, and subcontractors. Consistent with the following provisions, Contractor shall provide proof <br />satisfactory to City of such insurance that meets the requirements of this section and under forms of <br />insurance satisfactory in all respects, and that such insurance is in effect prior to beginning work. <br />Contractor shall maintain the insurance policies required by this section throughout the term of this <br />Agreement. The cost of such insurance shall be included in the Contractor's bid. Contractor shall not allow <br />any subcontractor to commence work on any subcontract until Contractor has obtained all insurance <br />required herein for the subcontractor(s) and provided evidence to City that such insurance is in effect. <br />VERIFICATION OF THE REQUIRED INSURANCE SHALL BE SUBMITTED AND MADE PART OF THIS <br />AGREEMENT PRIOR TO EXECUTION. Contractor shall maintain all required insurance listed herein for <br />the duration of this Agreement, <br />Non -Professional Services Agreement between May 6, 2019 <br />City of San Leandro and Monterey Mechanical Page 5 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.