My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2019 0903
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2019
>
Packet 2019 0903
>
8I Consent 2019 0903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2019 6:50:41 PM
Creation date
8/28/2019 6:50:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/3/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 19-429 <br />Analysis <br />Columbia Electric, Inc. was issued a Notice to Proceed for work on this project on November 13, <br />2018. The work was completed and was performed in compliance with the contract documents <br />and City standards. <br />Current Agency Policies <br />·Maintain and enhance the City’s infrastructure <br />Previous Actions <br />·On September 17, 2018, by Resolution 2018-113, the City Council awarded a <br />construction contract to Columbia Electric, Inc., for $251,267.50 for the Pedestrian <br />Crossings Improvements 2016-2017 Phase 2, Project No. 2017.5600. <br />Applicable General Plan Policies <br />·Goal T-2: Design and operate streets to be safe, attractive, and accessible for all <br />transportation users whether they are pedestrians, bicyclist, transit riders or motorists, <br />regardless of age or ability <br />o Policy T-2.1: Complete Streets Serving All Users and Modes <br />·Goal T-3: Promote and accommodate alternative, environmentally-friendly methods of <br />transportation, such as walking and bicycling. <br />o Policy T-3.6: Pedestrian Environment. Improve the walkability of all streets in San <br />Leandro through the planning, implementing and maintaining of pedestrian <br />supportive infrastructure. <br />Environmental Review <br />This project is categorically exempt per California Environmental Quality Act (CEQA) Section <br />15301(c) of the CEQA guidelines. The Notice of Exemption was filed with the Alameda County <br />Recorder’s Office on June 15, 2018. <br />Summary of Public Outreach Efforts <br />This project was advertised in the East Bay Express on July 20, 2018 as well as in three other <br />newspapers with circulations that reflect the diversity of San Leandro. Staff also notified <br />contractors interested in working with the City via email and the City sent plans to plan rooms. <br />Prior to construction, Changeable Message Sign (CMS) boards and arrow boards notified the <br />public of lane closures and lane shifts to complete the work as well as how to utilize the new <br />signal. <br />Fiscal Impacts <br />Page 2 City of San Leandro Printed on 8/28/2019 <br />98
The URL can be used to link to this page
Your browser does not support the video tag.