Laserfiche WebLink
F. Title 24 Building Energy Efficiency shall be satisfied. <br />G. Structural Calculations shall be provided. <br />V. ENGINEERING AND TRANSPORTATION DEPARTMENT REQUIREMENTS <br />MUNICIPAL REGIONAL STORMWATER PERMIT PROVISION C.3 <br />(CLEAN WATER PROGRAM) CONDITIONS: <br />A. The applicant shall submit a detailed Operations and Maintenance agreement <br />in accordance with MRP section C.3.h. The O&M agreement shall be required <br />prior to Grading Permit issuance. <br />B. The applicant shall reduce storm water pollution by implementing the following <br />pollution source control measures: <br />1. Structures shall be designed to discourage the occurrence and entry <br />of pests into buildings, thus minimizing the need for pesticides. The <br />trash area shall be separated from the rest of the building by concrete <br />or masonry walls so that pests that gain access to the area are less <br />likely to access the rest of the building. <br />2. All storm drains shall be marked "NO DUMPING, DRAINS TO BAY" <br />3. All on-site storm drains shall be inspected and, if necessary, cleaned <br />at least twice a year immediately prior to the rainy season. <br />4. Sidewalks and parking lots shall be swept regularly to minimize the <br />accumulation of litter and debris. Steam cleaning or low volume <br />pressure washing may be performed only after pre -cleaning using dry <br />methods, spot cleaning and recovery in stained areas and removal <br />of all mobile pollutants. Debris resulting from pressure washing shall <br />be trapped and collected to prevent entry into the storm drain system. <br />Wash water containing any soap, cleaning agent or degreaser shall <br />not be discharged to the storm drain. <br />5. Interior floor drains (if any) shall not be connected to the storm drain <br />system. <br />6. Air conditioning condensate shall be directed to landscaped areas. <br />Any air conditioning condensate that discharges to land without <br />flowing to a storm drain may be subject to the requirements of the <br />State Water Resources Control Board's (SWRCB) Statewide <br />General Waste Discharge Requirements (WDRs) for Discharges to <br />Land with a Low Threat to Water Quality. <br />Conditions of Approval June 6, 2019 <br />PLN18-0045 Page 8 of 18 <br />