Laserfiche WebLink
M. For the applicant's information, the potable water network that serves the site <br />is owned and operated by East Bay Municipal Utility District (EBMUD). Please <br />contact EBMUD at 866-403-2683 for more information about connections and <br />water service. <br />N. Any construction near the guy wire anchor for the utility pole at the west end of <br />the project frontage will require prior approval from PG&E. <br />O. A lighting plan and photometric study must be developed and submitted for <br />approval along with the building permit application to assure sufficient <br />illumination for the safety and security of the future building occupants. <br />P. For the applicant's information, the sanitary sewer network that serves the site <br />is owned and operated by the City of San Leandro. More information about <br />connections to the City's network can be found at the following web link: <br />http://www.sanleandro.org/depts/pw/wpcp/sewer/defauIt.asp <br />Q. The Utility Plan shows the 6" sanitary sewer lateral tying into the 6" sewer main <br />in Parrott Street. The City is inspecting any defects in this sanitary sewer <br />segment in Parrott Street and if the Pipeline Assessment Certification Program <br />(PACP) index rating is 3 or worse (as graded from 1 to 5) or if the new lateral <br />connection will cause any structural damage to the sanitary sewer main line, <br />the applicant shall replace the main pipeline from manhole to manhole as part <br />of this project prior to making the sewer lateral connection. <br />R. The applicant shall locate all electric and communications utilities serving the <br />site underground. <br />IMPACT FEES: <br />Please note that this is an estimated amount. These fees are subject to change <br />at the start of each fiscal year and will not be vested until issuance of building <br />permit. <br />S. Street Improvement. The Development Fee for Street Improvement (DFSI) is <br />calculated for the project using the Fiscal Year 18-19 rate of $1,437.92 per <br />residential unit, and $4.47 per square foot for the 2,520 square foot retail space, <br />for a total of $48,650.32. <br />T. Marina Boulevard/1-880 Interchange Fee. The Marina Boulevard/Interstate <br />880 Interchange Traffic Impact Fee is calculated for the project using the Fiscal <br />Year 18-19 rate of $723.25 per residential unit, and $1.77 per square foot for <br />the 2,520 square foot retail space, for a total of $23,264.90. <br />U. Park Land Fee. The Park Land Acquisition fee is calculated for the project <br />using the Fiscal Year 18-19 rate of $14,126 per multi -family residential unit, for <br />a total of $367,276 and is due at the time of Building Permit issuance. <br />Conditions of Approval June 6, 2019 <br />PLN18-0045 Page 11 of 18 <br />