Laserfiche WebLink
C. Applicant should note the City of San Leandro holds an exclusive franchise <br />agreement for solid waste and recycling services with Alameda County <br />Industries. (ACI). <br />D. Project must comply with all City and State construction and demolition debris <br />recycling requirements. Permit applicants must demonstrate compliance by <br />completing and submitting an online Waste Management Plan using Green <br />Halo Systems (www.GreenHaloSystems.com) prior to permit issuance. <br />Applicants must submit recycling and disposal receipts online and submit the <br />waste management report before scheduling the final inspection. Note: <br />Project will not be finaled until all recycling and disposal tags have been <br />registered into Green Halo Systems. <br />VIII. FENCING AND SCREENING REQUIREMENTS <br />A. All fencing, gates and walls on the project site shall be structurally sound, <br />graffiti -free and well maintained at all times. <br />B. Barbed or razor wire shall not be installed on any fence, wall or building on <br />the project site. The installation of chain link or cyclone fencing shall be <br />prohibited. <br />C. All walls, fences, and landscaping within a street setback or driveway shall be <br />maintained at a height of not more than 36 inches above the top of the nearest <br />adjacent curb and gutter to allow for adequate sight distance, or unless <br />otherwise approved by the City's Transportation Engineer. <br />D. All exterior mechanical equipment such as air conditioning/heating units and <br />radio/television antennas shall be screened from view so as not to be visible <br />from adjacent properties or streets to the satisfaction of the Community <br />Development Director. This condition shall not apply to wireless receivers that <br />do not exceed three feet in diameter. <br />E. The applicant shall work with the utility provider in painting and/or screening <br />any ground mounted transformer located along either Parrott St. or <br />Washington Avenue to the extent permissible by the utility provider. <br />IX. MAINTENANCE <br />A. The project site and public right-of-way shall be well maintained and shall be <br />kept free of litter, debris and weeds at all times; during construction. Post <br />construction, the project site and public right of way shall be well maintained <br />and shall be kept free of litter, debris and weeds. Trash enclosures shall be <br />kept clean of debris. Street trees and tree wells shall be maintained. The <br />property owner and/or homeowners/condominium association shall be <br />responsible for the maintenance of the project site and the adjacent public <br />right-of-way. <br />Conditions of Approval June 6, 2019 <br />PLN18-0045 Page 13 of 18 <br />