Laserfiche WebLink
j) <br />k) <br />1) <br />M) <br />Plant materials selected shall be appropriate to site specific characteristics <br />such as soil type, topography, climate, amount and timing of sunlight, <br />prevailing winds, rainfall, air movement, patterns of land use, ecological <br />consistency and plant interactions to ensure successful establishment. <br />Selection of the plants that will require minimal pesticide use. <br />Irrigation shall be appropriate to the water requirements of the selected <br />plants. <br />The applicant shall select pest and disease resistant plants. <br />The applicant shall plant a diversity of species to prevent a <br />infestation from affecting the entire landscaping plan. <br />n) The applicant shall plan insectary plants in the landscaping <br />keep beneficial insects. <br />potential pest <br />to attract and <br />R. Water heater drain lines shall be directly or indirectly connected to the sanitary <br />sewer system and may not discharge to the storm drain system. <br />S. The applicant shall comply with the following high standards of sanitation during <br />construction of improvements: garbage cans, construction dumpsters, and <br />debris piles shall be removed on a minimum weekly basis. All food related trash <br />items such as wrappers, cans, bottles, and food scraps shall be disposed of in <br />closed containers only and shall be regularly removed from the site. <br />Inspections, conducted as part of the regular construction compliance, will be <br />conducted to ensure compliance of the applicant and contractors with this <br />requirement. <br />T. A one-time Development Fee for Street Improvements (DFSI) shall be <br />assessed for the two proposed dwelling units approximately in the amount of <br />$2,875.84, which is calculated at $1,437.92 per housing unit and shall be paid <br />prior to issuance of the building permit. These fees are subject to change each <br />fiscal year and will not be vested until issuance of building permit. <br />U. A one-time Marina Boulevard/Interstate 880 Interchange Traffic Impact Fee <br />shall be assessed for the two new units, approximately in the amount of <br />$1,446.50, which is calculated at $723.25 per unit, and is due at the time of <br />building permit issuance. This fee is subject to change at the beginning of each <br />fiscal year and is not vested until Building Permit issuance. <br />V. A one-time Park Facilities Development Impact Fee shall be assessed <br />assuming 2 dwelling unit (du) will be added to the property as follows: <br />Park Land Acquisition Fee: $14,126.00/du or $28,252.00 <br />Park Improvement Fee: _ $2,279.00/du or $4,558.00 <br />Total Park Impact Fee: <br />$16,405.00/du or <br />Please note that this is an estimated amount. These fees are subject to <br />Agreement to Conditions August 1, 2019 <br />PLN 18-0091 Page 9 of 15 <br />