Laserfiche WebLink
siding, shingles, trims, light fixtures, and window and door manufacturers to <br />ensure that exterior materials and finishes meet the standards specified in the <br />approved exhibits. Any changes to the approved building specifications must <br />be made in writing to the Zoning Enforcement Official, who may either <br />administratively approve the modification or bring it back to the Board of Zoning <br />Adjustments for review. In addition, a final color and materials board shall be <br />submitted for the exterior for the review and approval of the Zoning <br />Enforcement Official, prior to issuance of building permits. <br />E. Prior to issuance of building permits a final landscape and irrigation plan that <br />complies with the City's Landscape Ordinance and State Model Water Efficient <br />Landscape Ordinance (MWELO) shall be submitted to the Zoning Enforcement <br />Official for review and approval. Said plans shall include, but is not limited to, <br />trees with a minimum size of 15 gallons, a pallet of shrubs and ground cover <br />planting that is flowering plants, or plants that have colorful foliage. The <br />minimum size for the shrubs shall be five gallons and the ground cover shall be <br />one gallon or shall be from flats with the necessary spacing to cover the planter <br />areas in one growing season. <br />F. Prior to issuance of a Building Permit Final and Certificate of Occupancy for the <br />new units, the final landscaping and irrigation specified on the final landscape <br />and irrigation plan shall be completely installed to the satisfaction of the Zoning <br />Enforcement Official and Appendix C for MWELO shall be submitted. <br />G. Prior to issuance of building permits, the applicant shall submit final details and <br />specifications and a sample of the proposed concrete (color or wash details) <br />driveway, and/or concrete/stone pavers to be used for the project for the review <br />and approval of the Zoning Enforcement Official and City Engineer. <br />H. Prior to issuance of building permits, the applicant shall indicate details and <br />specifications for exterior lighting on the proposed structure. Any new exterior <br />lighting proposed shall be low wattage and designed and located to cast light <br />downward and as not to shine on adjacent properties, details subject to the <br />approval of the Zoning Enforcement Official. <br />Prior to issuance of building permits, applicant shall submit a checklist showing <br />that the project meets the minimum green building rating for a residential <br />buildings, according to the most current GreenPoint Rated for Newly - <br />Constructed Residential Buildings, or equivalent green building rating system <br />as adopted by the City of San Leandro at the time of submittal for building <br />permits. Features indicated on said checklist shall be incorporated into building <br />permit plans. <br />Agreement to Conditions August 1, 2019 <br />PLN 18-0091 Page 4 of 15 <br />