Laserfiche WebLink
Farrelly Pool Timeline <br />1928 Pool and facilities built <br />2015 Last season of operation <br />7/2017 Funded replacement of the pool and pool equipment. <br />4/2018 Hired Glass Architects to design project <br />10/2018 Architect determines that new pool equipment won’t fit within <br />existing building.Expanding the building will trigger upgrades to the <br />entire building. <br />1/2019 Discussed options with Facilities and Transportation Committee. <br />Determined that a new facility was best option. <br />6/2019 1st bid: $6.6M <br />10/2019 2nd bid: $6.2M 212