My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes 2018 0904
CityHall
>
City Clerk
>
City Council
>
Minutes
>
2018
>
Minutes 2018 0904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 10:13:06 AM
Creation date
10/30/2019 11:18:14 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minutes
Document Date (6)
9/4/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes September 4, 2018 <br />2016-17 Project Phase 1; Project No. 2017.0050 <br />18-326 RESOLUTION to Accept the Work for the Annual Overlay / Rehabilitation <br />2016-17 Project Phase 1, Project No. 2017.0050 (provides for <br />acceptance of the work performed by DeSilva Gates Construction, L.P., <br />filing the Notice of Completion, releasing the performance and payment <br />bonds, and releasing the maintenance bond upon successful completion <br />of the one-year maintenance period) <br />Adopted. <br />Enactment No: Reso 2018-097 <br />8.M. 18-380 Staff Report for a City of San Leandro City Council Resolution to <br />Approve Amendments to a Consulting Services Agreement with CSG <br />Consultants, Inc. for On -Call Engineering Plan Check, City Surveyor, <br />Land Surveying, and Engineering Inspection Services <br />18-381 RESOLUTION of the City of San Leandro City Council to Approve an <br />Amendment to a Consulting Services Agreement wWith CSG <br />Consultants, Inc. For for On -Call Engineering Plan Check, City Surveyor, <br />Land Surveying, and Engineering Inspection Services (provides for <br />additional inspection services for the Annual Overlay/Rehabilitation <br />2017-18 Project) <br />Adopted. <br />Enactment No: Reso 2018-098 <br />Item 8.N. was removed from the Consent Calendar to Item 9, Items Removed from <br />Consent Calendar. <br />8.0. 18-390 Adoption of a City of San Leandro City Council Resolution to Substitute <br />Collateral for the Section 108 Guaranteed Loan from the United States <br />Department of Housing and Urban Development (HUD) for the <br />Construction of the San Leandro Senior Community Center by <br />Designating as Collateral $190,635.20 in the City's General Fund <br />Reserves <br />18-391 RESOLUTION of the City of San Leandro City Council to Substitute <br />Collateral for the Section 108 Guaranteed Loan from the United States <br />Department of Housing and Urban Development (HUD) for the <br />Construction of the San Leandro Senior Community Center by <br />Designating as Collateral $190,635.20 in the City's General Fund <br />Restricted Reserve <br />Adopted. <br />Enactment No: Reso 2018-099 <br />City of San Leandro Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.