Laserfiche WebLink
Exhibit A Findings of Fact November 4, 2019 <br />PLN17-0069 874 Lewelling Boulevard Page 3 of 6 <br />4. That the proposed use will not create adverse impacts on traffic or create <br />demands exceeding the capacity of public services and facilities, which cannot be <br />mitigated. <br />The surrounding streets have adequate capacity to accommodate the traffic <br />generated by this development. Per Institute of Transportation Engineers (ITE) Trip <br />Generation Manual 10th Edition (2018), a six-unit townhome development would <br />generate approximately three trips in the PM peak hour and approximately 35 <br />vehicle trips per day. In addition, the Route 35 AC Transit bus is within a two <br />minute walk from the project site on Lewelling Boulevard, which runs from Bay <br />Fair BART Station to Durant Square in Oakland via San Leandro Marina, West <br />Gate, and San Leandro BART station with 30-minute headways on weekdays and <br />one hour headways on weekends. An existing striped Class II bike lane runs in both <br />directions along Lewelling Boulevard directly in front of the site. <br /> <br />There is adequate public service to the proposed development, including but not <br />limited to: the gas and electric company, the water district, waste disposal, cable <br />TV and police and fire department. <br />5. The Planned Development Project Plan will provide superior urban design in <br />comparison with the development under the base district zoning regulations. <br />The Planned Development site plan allows for adequate overall front, side, and rear <br />setbacks from neighboring developments while the townhome style is an efficient <br />design, maximizing floor area with less coverage. The proposal provides for <br />sufficient open and landscaped areas for usable community space and on-site <br />stormwater retention. <br />6. The Planned Development Project includes adequate provisions for utilities, <br />services, and emergency vehicle access; and that public service demands will not <br />exceed the capacity of the existing and planned systems. <br />There is adequate public service provided to the proposed subdivision, including <br />but not limited to the gas and electric, the water, waste disposal, cable TV, and <br />police and fire services. The Engineering and Transportation Department, and Fire <br />Department have found the access to the site to be safe for vehicular, pedestrian <br />and emergency vehicle access. <br />SITE PLAN REVIEW <br />1. Site plan elements (such as but not limited to: building placement, yard setbacks, <br />size and location of landscape areas, parking facilities and placement of service <br />areas) are in compliance with the minimum requirements of this Code, and are <br />arranged as to achieve the intent of such requirements by providing a <br />harmonious and orderly development that is compatible with its surroundings. <br />Parking, loading, storage and service areas are appropriately screened by <br />building placement, orientation walls and/or landscaping. <br />The proposed two- and three-story townhome buildings would be compatible <br />within the existing multi-family residential context of the immediate vicinity. With