My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-182
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:55:41 AM
Creation date
11/6/2019 9:34:56 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
11/4/2019
Retention
PERM
Document Relationships
8D Consent 2019 1104
(Amended)
Path:
\City Clerk\City Council\Agenda Packets\2019\Packet 2019 1104
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Non-Professional Services Agreement between November 4, 2019 <br />City of San Leandro and Solenis, LLC Page 4 of 22 <br /> <br />2.8 Payment upon Termination. In the event that the City or Contractor terminates this <br />Agreement pursuant to Section 8, the City shall compensate the Contractor for all <br />outstanding costs and reimbursable expenses incurred for work satisfactorily completed as <br />of the date of written notice of termination. Contractor shall maintain adequate logs and <br />timesheets to verify costs incurred to that date. <br /> <br />2.9 Authorization to Perform Services. The Contractor is not authorized to perform any <br />services or incur any costs whatsoever under the terms of this Agreement until receipt of <br />authorization from the Contract Administrator. <br /> <br />2.10 Liquidated Damages. Failure of Contractor to respond to problems referred to it by City <br />within the time limits established in Subsection 1.2 of this Agreement shall result in <br />liquidated damages as set forth in Exhibit A. <br /> <br /> <br />Section 3. FACILITIES AND EQUIPMENT. Except as set forth herein, Contractor shall, at its sole <br />cost and expense, provide all facilities and equipment that may be necessary to perform the services <br />required by this Agreement. City shall make available to Contractor only the facilities and equi pment listed <br />in this section, and only under the terms and conditions set forth herein. Contractor shall make a written <br />request to City to use facilities or equipment not otherwise listed herein. <br /> <br />3.1 Safety Requirements. In accordance with generally accepted construction practices and <br />state law, Contractor shall be solely and completely responsible for conditions on the <br />jobsite, including safety of all persons and property during performance of the work. This <br />requirement shall apply continuously and not be limited to normal working hours. <br /> <br />Contractor shall take all necessary precautions and provide all necessary safeguards to <br />prevent personal injury and property damage. Contractor shall provide protection for all <br />persons including, but not limited to, its employees and employees of its subcontractors; <br />members of the public; and employees, agents, and representatives of the City and <br />regulatory agencies that may be on or about the work. <br /> <br />The services of the City in conducting review and inspection of Contractor's performance is <br />not intended to include review of the adequacy of Contractor's work methods, equipment, <br />bracing or scaffolding, or safety measures, in, on, or near any Contractor jobsite. <br /> <br />All work and materials shall be in strict accordance with all applicable state, city, county, <br />and federal rules, regulations and codes, with specific attention to the United States <br />Department of Labor Occupational Health and Safety Administration (OSHA) <br />requirements. Contractor shall be solely responsible for compliance with all city, county, <br />and state explosive transport, storage, and blasting requirements and for any damages <br />caused by such operations. <br /> <br />Contractor is hereby informed that work on City property could be hazardous. Contractor <br />shall carefully instruct all personnel working on City property that all conditions of the
The URL can be used to link to this page
Your browser does not support the video tag.