File Number: 19-573 <br />In addition to the work contemplated by the original construction contract, the City also authorized <br />Sposeto Engineering, Inc. to complete additional work by contract change order (CCO). Utilizing <br />the contractor’s availability and expertise allowed needed concrete improvements to be <br />completed quickly and efficiently within the allocated budget contingency. These improvements <br />included the upgrade of curb ramps at the intersection of Washington Avenue and Parrott Street <br />in preparation for the Rainbow Crosswalk installation, and sidewalk replacement associated with <br />the traffic signal improvements at the intersection of Bancroft Avenue and Sybil Avenue. <br />Under San Leandro Municipal Code Section 5-1-415, property owners are responsible for <br />maintenance and repair of the sidewalks adjoining their property. The Sidewalk Repair Program <br />offers property owners an opportunity to use a City-hired contractor for needed repairs, the direct <br />cost of which is billed to them upon completion. Taking advantage of this program allows property <br />owners to benefit from the economies-of-scale inherent in combining many small repairs into one <br />large project. Property owners also avoid having to hire a contractor on their own and incurring <br />permitting and inspection costs. <br />This program benefits both property owners and the City by eliminating trip-and-fall hazards. The <br />program strives to create a safe walking environment for pedestrians, and makes the City a <br />better place to live and work. <br />Analysis <br />The construction contract is now complete. The work was inspected and found to be in <br />compliance with the contract documents and City Standards. <br />Current Agency Policies <br />City Council Goals: <br />·Maintain and enhance San Leandro’s Infrastructure <br />Previous Actions <br />·On March 5, 2018, by Resolution No. 2018-018, the City Council awarded a $569,311 <br />construction contract to Sposeto Engineering, Inc. for the subject project, and authorized <br />cumulative CCO’s not-to-exceed $142,327 (25% contingency) for a total construction <br />budget of $711,638. <br />Applicable General Plan Policies <br />·Policy T-3.6 - Pedestrian Environment. Improve the walkability of all streets in San Leandro <br />through the planning, implementing, and maintaining of pedestrian supportive <br />infrastructure. <br />·Policy T-3.7 - Removing Barriers to Active Transportation. Reduce barriers to walking and <br />other forms of active transportation such as incomplete or uneven sidewalks, lack of <br />Page 2 City of San Leandro Printed on 11/13/2019 <br />65