Laserfiche WebLink
File Number: 19-573 <br />144-38-006 Measure B/ACTIA Fund FY17/18 $124,216 <br />Total $1,110,456 <br />Notes: <br />1 Street/Traffic Improvements (DFSI) funds were used for CCO work to replace the sidewalk associated with the <br />Bancroft-Sybil Signal Improvements, Project No. 2014.0440. <br />ATTACHMENT <br />Attachment to Staff Report <br />·Post-Construction Photos - Annual Sidewalk Repair Program 2017-18 <br />PREPARED BY: Phillip Toste, P.E., Associate Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 11/13/2019 <br />67