My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2019176139
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2019
>
Inst 2019176139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 4:21:07 PM
Creation date
11/27/2019 4:20:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/6/2019
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 SITE INSPECTION <br />Inspection Schedule <br />Routine Maintenance Activities for Bioretention Areas <br />No. <br />Maintenance Activity <br />Frequent <br />1 <br />Remulch void areas and remove sediment <br />As needed <br />2 <br />Treat diseased trees and shrubs <br />As needed <br />3 <br />Water plants daily for two weeks <br />At project completion <br />4 <br />Inspect soil and repair eroded areas <br />Month) <br />5 <br />Remove litter and debris <br />Monthly <br />6 <br />Remove and replace dead and diseased vegetation <br />Twice per year <br />7 <br />Add additional mulch <br />Once per year <br />8 <br />Replace tree stakes and wire <br />Once per year <br />1.4 SITE INSPECTION <br />Inspection Schedule <br />No. <br />Inspection Activity <br />Frequent <br />1 <br />Inspect soil and repair eroded areas <br />Monthly <br />2 <br />Inspect for erosion or damage to vegetation, preferably at the end of <br />the wet season to schedule summer maintenance and before major <br />fall runoff to be sure the planters are ready for winter. However, <br />additional inspections after periods of heavy runoff is desirable. <br />Semi-annually <br />3 <br />Check for debris and litter, and areas of sediment accumulation <br />Semi-annual) <br />4 <br />Inspect health of trees and shrubs <br />Semi-annually <br />5 <br />Replace tree stakes and wire <br />Once per year <br />Further inspection and maintenance activities which shall be completed as needed are: <br />1. Perform annual testing of any mechanical or electrical devices prior to wet weather. <br />2. Report any significant changes in stormwater control measures to the site management. As <br />appropriate, assure mechanical devices are working properly and/or landscaped BMP plantings are <br />irrigated and nurtured to promote think growth. <br />3. Note any significant maintenance requirements due to spills or unexpected discharges. <br />4. As appropriate, perform maintenance and replacements as scheduled and as needed in a timely <br />manner to assure stormwater control measures are performing as designed and approved. <br />5. Assure unauthorized low -flow discharges from the property do not by-pass stormwater control <br />measures. <br />6. Perform an annual assessment of each pollution generation operation and its associated stormwater <br />control measures to determine if any part of the pollution reduction train can be improved. <br />The owner of the property is responsible for documenting and retaining records of all inspection activities per <br />standards set forth in the SWQCCP. Records of inspections shall be kept in storage in a binder or folder and <br />retained for at least 3 years from date of inspection. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.