My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-171
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 12:33:43 PM
Creation date
12/6/2019 12:32:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
10/21/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />311 MacArthur Boulevard Residential Project <br /> <br />28 <br />substantial pollutant concentrations. Impacts would not be more significant than what was analyzed <br />previously. <br />LESS THAN SIGNIFICANT OR LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED <br />d. Would the project result in other emissions (such as those leading to odors) adversely affecting <br />a substantial number of people? <br />As addressed in the General Plan EIR, 2035 General Plan implementation would not create <br />objectionable odors affecting a significant number of people. According to the BAAQMD, odor- <br />generating projects include wastewater treatment plants, landfills, confined animal facilities, <br />composting stations, food manufacturing plants, refineries, and chemical plants, none of which are <br />proposed (BAAQMD 2017b). Therefore, no project components would emit odors beyond those <br />previously assessed; no impacts beyond those analyzed previously would occur. <br />LESS THAN SIGNIFICANT OR LESS THAN SIGNIFICANT WITH MITIGATION INCORPORATED <br />Conclusion <br />Based on the air quality analysis provided in the General Plan EIR and consideration of the project <br />relative to BAAQMD thresholds described above, no specific impacts or peculiar circumstances <br />associated with the project would occur that would require additional review. The project would <br />comply with all applicable City and BAAQMD requirements. The project would not have a <br />substantially more severe impact to air quality, nor would there be any potentially significant off- <br />site impacts, cumulative impacts, or previously identified significant effects not discussed in the <br />General Plan EIR. There are no previously identified significant effects that are determined to have a <br />more severe adverse impact than discussed in the General Plan EIR.
The URL can be used to link to this page
Your browser does not support the video tag.