My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2019-177
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2019
>
Reso 2019-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 12:36:34 PM
Creation date
12/6/2019 12:34:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
10/21/2019
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garland/DBS, Inc. <br />4 <br />3800 East 91St Street <br />Cleveland, OH 44105 <br />---------- Phone: (800) 762-8225 DBS <br />ax:since 1 895 F (216) 883-2055 <br />ROOFING MATERIAL AND SERVICES PROPOSAL <br />Marina Community Center <br />City of San Leandro <br />15301 Wicks Blvd <br />San Leandro, CA 94579 <br />Date Submitted: 08/16/2019 <br />Proposal #: 25 -CA -190684 <br />MICPA # 14-5903 <br />California General Contractor License #: 949380 <br />Purchase orders to be made out to: Garland/DBS, Inc. <br />Please Note: The following budget/estimate is being provided according to the pricing <br />established under the Master Intergovernmental Cooperative Purchasing Agreement (MICPA) <br />with Cobb County, GA and U.S. Communities. This budget/estimate should be viewed as the <br />maximum price an agency will be charged under the agreement. Garland/DBS, Inc. <br />administered a competitive bid process for the project with the hopes of providing a lower market <br />adjusted price whenever possible. <br />Scope of Work: Replacement <br />1. Remove and dispose of all base flashings, coping metal and edge metal, and <br />detail flashings. Main roof system to remain (see below for alternate). <br />Contractor to verify overlay is acceptable with thermal scan. <br />2. Mechanically fasten 1/2" asphalt coated wood fiber board per manufacturers <br />wind uplift calculations. <br />3. Install 2 ply modified StressPly system in Weatherking cold applied asphalt. <br />Adhesive to be applied at 2.5 gallons a square. <br />4. Allow the roof to cure for 30 days. <br />5. Apply Pyramic Plus LO in 2 coats. 1.5 gal/square/coat. <br />6. Install new preformed coping and edge metal. <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.