My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2019 0106
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0106
>
8F Consent 2019 0106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 2:32:38 PM
Creation date
12/23/2019 11:27:23 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
1/6/2020
Retention
PERM
Document Relationships
Reso 2020-003
(Reference)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: January 6, 2020 <br />Staff Report <br />Agenda Section:File Number:19-583 CONSENT CALENDAR <br />Agenda Number:8.F. <br />TO:City Council <br />FROM:Jeff Kay <br />City Manager <br />BY: <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a City of San Leandro City Council Resolution to Increase the <br />Contract Change Order Cap Authorization from 15% to 27% (from $263,100 to <br />$464,572; an Increase of $201,472) for the Original Construction Contract <br />Amount of $1,754,160 with Granite Construction, Inc. for the Annual <br />Overlay/Rehabilitation 2016-17 Phase 2, Project No. 2017.0050 <br />SUMMARY AND RECOMMENDATIONS <br />This contract provides for repaving of eight City streets. The increased change order <br />authorization will allow payment for extra work performed by the contractor due to unexpected <br />complications encountered during construction, as well as for the construction of improvements <br />added onto the project during the construction phase. <br />The project budget has sufficient allocation to fund the increased cost. <br />Staff recommends the following actions: <br />·Authorize an increase to the Contract Change Order (CCO) cap from 15% to 27% (from <br />$263,100 to $464,572; a Change Order Cap Increase of $201,472) for the original <br />contract amount of $1,754,160 with Granite Construction, Inc. for the subject project. <br />BACKGROUND <br />The City of San Leandro maintains approximately 174 centerline miles of paved roadways with <br />an average pavement condition index score of 59 out of 100 with 100 representing a newly paved <br />road. Each year the City conducts two pavement maintenance projects, one for street sealing <br />and one for street overlay / rehabilitation. This contract is for replacement of pavement (overlay) <br />and for repair of the subgrade below the pavement (rehabilitation), to address pavement in poor <br />and failed condition. <br />This project has funded two design contracts and two construction contracts. Design contracts <br />Page 1 City of San Leandro Printed on 12/23/2019 <br />44
The URL can be used to link to this page
Your browser does not support the video tag.