My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2019 0106
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0106
>
8G Consent 2019 0106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 2:35:23 PM
Creation date
12/23/2019 11:27:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
1/6/2020
Retention
PERM
Document Relationships
Reso 2020-006
(Reference)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 19-581 <br />·Maintain and enhance San Leandro’s infrastructure <br />Previous Actions <br />·On September 3, 2019, by Resolution No 2019-140 the City Council rejected all bids for <br />the Pedestrian Crossing Improvements 17-18. <br />Applicable General Plan Policies <br />·Goal T-2: Design and operate streets to be safe, attractive, and accessible for all <br />transportation users whether they are pedestrians, bicyclist, transit riders or motorists, <br />regardless of age or ability <br />·Policy T-2.1: Complete Streets Serving All Users and Modes <br />·Goal T-3: Promote and accommodate alternative, environmentally-friendly methods of <br />transportation, such as walking and bicycling. <br />·Policy T-3.6: Pedestrian Environment. Improve the walkability of all streets in San <br />Leandro through the planning, implementing and maintaining of pedestrian <br />supportive infrastructure. <br />Environmental Review <br />This project is categorically exempt per California Environmental Quality Act (CEQA) Section <br />15301(c) of the CEQA guidelines. The Notice of Exemption was filed with the Alameda County <br />Recorder’s Office on July 1, 2019. <br />Summary of Public Outreach Efforts <br />·This project was advertised in the East Bay Express on October 18, 2019 as well as in <br />three other newspapers with circulations that reflect the diversity of San Leandro. <br />·Property owners that will have alterations to their frontages within the public right-of-ways <br />were notified by mail. <br />·Plans for the crossings improvements were presented to the Bicycle and Pedestrian <br />Advisory Committee on June 11, 2019. <br />·On September 17, 2019, staff held a meeting with residents within the influence area of the <br />proposed crosswalk at the intersection of Bancroft Blvd and Haas Ave to answer <br />questions and discuss the design and possible design alternatives. <br />·Staff notified contractors interested in working with the City via email, and sent plans to <br />local plan rooms. <br />Prior to construction, staff will notify residents and businesses that will be directly impacted. <br />Fiscal Impacts <br />Estimated project costs are as follows: <br />Page 3 City of San Leandro Printed on 12/23/2019 <br />52
The URL can be used to link to this page
Your browser does not support the video tag.