My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2020-019
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2020
>
Reso 2020-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:43:49 PM
Creation date
3/3/2020 4:28:23 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
2/24/2020
Recorded Document Type
_Other
Retention
PERM
Document Relationships
3A Public Hearing 2020 0224
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2020\Packet 2020 0224
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br />3.5 CULTURAL RESOURCES <br />3.5.1 IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT <br />Would the proiect: <br />Background: <br />2019 Appendix G Threshold <br />The CEQA Checklist Guidelines for Cultural Resources has been updated since those used for the Certified <br />EIR of the Original Project. The changes are detailed below: <br />IV. BIOLOGICAL RESOURCES. <br />Would the project: <br />a) Cause a substantial adverse change in the significance of a historical resource pursuant to a -s <br />Ph- iped in § 15064.5? <br />b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to <br />§ 15064.5? <br />€eae? <br />c) Disturb any human remains, including those interred outside of dedicated cemeteries? <br />Comments: <br />CUL -a, b, c. <br />The overall project area boundaries are unchanged for the Modified Project, therefore, there are no new <br />areas that were not addressed within the Certified EIR. As with the Original Project, there are no <br />Page 40 Place Works <br />Less Than <br />Significant <br />Impacts/No <br />Changes or <br />Substantial <br />Substantial <br />New <br />New <br />Change in <br />Change in <br />Information <br />Information <br />Project <br />Circumstanc <br />Showing <br />Requiring <br />Requiring <br />es Requiring <br />New or <br />Preparation <br />Major <br />Major <br />Increased <br />of a <br />EIR/MND <br />EIR/MND <br />Significant <br />Subsequent <br />Environmental Issues <br />Revisions <br />Revisions <br />Effects <br />EIR/MND <br />No Impact <br />a) Cause a substantial adverse <br />change in the significance of a historical <br />x <br />resource pursuant to in §15064.5? <br />b) Cause a substantial adverse <br />change in the significance of an <br />archaeological resource pursuant to <br />x <br />§15064.5? <br />C) Disturb any human remains, <br />including those interred outside of dedicated <br />x <br />cemeteries? <br />Background: <br />2019 Appendix G Threshold <br />The CEQA Checklist Guidelines for Cultural Resources has been updated since those used for the Certified <br />EIR of the Original Project. The changes are detailed below: <br />IV. BIOLOGICAL RESOURCES. <br />Would the project: <br />a) Cause a substantial adverse change in the significance of a historical resource pursuant to a -s <br />Ph- iped in § 15064.5? <br />b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to <br />§ 15064.5? <br />€eae? <br />c) Disturb any human remains, including those interred outside of dedicated cemeteries? <br />Comments: <br />CUL -a, b, c. <br />The overall project area boundaries are unchanged for the Modified Project, therefore, there are no new <br />areas that were not addressed within the Certified EIR. As with the Original Project, there are no <br />Page 40 Place Works <br />
The URL can be used to link to this page
Your browser does not support the video tag.