My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2020 0420
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0420
>
8D Consent 2020 0420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:45:19 PM
Creation date
4/15/2020 3:45:09 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
4/20/2020
Retention
PERM
Document Relationships
Reso 2020-036
(Reference)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 20-124 <br />The District found the canal project to be categorically exempt from the California Environmental <br />Quality Act. <br />The bridge work is categorically exempt per CEQA Section(s) 15302(c) Replacement or <br />Reconstruction of existing facilities with no expansion of capacity. <br />Summary of Public Outreach Efforts <br />The modifications to Estudillo Canal were included in discussions with the public about the <br />Neptune Drive Flood Protection project. Public meetings were held on July 29, 2019 and <br />November 13, 2019. <br />Monarch Bay Drive Bridge will remain open to bicycles and pedestrians throughout the project; <br />signs will be posted alerting users to the construction. <br />Fiscal Impacts <br />There is no fiscal impact to the City for the work on the Estudillo Canal. <br />The total cost of the Monarch Bay Drive Bridge project is as follows: <br />Design and Bid:$25,000 <br />Construction Contract:$250,000 <br />District cost for construction administration:$37,500 <br />Contingency:$62,500 <br />City Inspection:$15,000 <br />Total $390,000 <br />Budget Authority <br />The bridge project is funded as follows: <br />Account No. Reso., Appropriation Dates & Source Amount <br />141-38-394 CIP budget FY 17-18 $550,000 <br />Attachment to Related Legislative File <br />·Cooperative Agreement - Alameda County Flood Control and Water Conservation District <br />PREPARED BY: Nick Thom, City Engineer, Engineering and Transportation Department <br />Page 4 City of San Leandro Printed on 4/15/2020 <br />92
The URL can be used to link to this page
Your browser does not support the video tag.