My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2020 0420
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0420
>
8F Consent 2020 0420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:49:24 PM
Creation date
4/15/2020 3:49:22 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
4/20/2020
Retention
PERM
Document Relationships
Reso 2020-037
(Reference)
Path:
\City Clerk\City Council\Resolutions\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 20-100 <br />City of San Leandro In-House Streets Maintenance - FY 2021 <br />START/ <br />LOCATION EX./PROP. PCI EST. LIFE COMPLETION <br />Thornton St. (Residential); from San Leandro 11/100 20 years Sept./Sept. 2020 <br />Blvd. west to dead end. Remove and replace <br />asphalt surface (estimate 525 tons). <br />Williams St. (Collector); from San Leandro Blvd.62/100 20 years Sept./Oct. 2020 <br />West to UPRR tracks. Remove and replace <br />asphalt surface (estimate 56 tons). <br />Marina Blvd. (Arterial); from San Leandro Blvd.25/100 20 years Oct./Oct. 2020 <br />West to UPRR tracks. Remove and replace asphalt <br />surface (estimate 112 tons). <br />Harlan St. (Residential); from San Leandro Blvd.5/100 20 years Oct./Oct. 2020 <br />West to dead end. Remove and replace asphalt <br />surface (estimate 252 tons). <br />Estabrook St. (Residential); from San Leandro Blvd.5/100 20 years Nov./Nov. 2020 <br />West to dead end. Remove and replace asphalt <br />surface (estimate 282 tons). <br />Cypress St. (Residential); from Cedar Ave. to 9/100 20 years May/May 2021 <br />Willow Ave. Remove and replace asphalt surface <br />(estimate 1,050 tons). <br />Crack Sealing Streets: <br />Wicks Blvd. from Merced St. to Lewelling Blvd.73-78/100 5 years June/June 2021 <br />Lake Chabot Road from Estudillo to Astor Dr.48/50 5 years June/July 2021 <br />Work continuing from FY 2020 to FY 2021 includes: <br />Projects Anticipated to be Rolled Over from FY 20: <br />West Ave. 134th (Residential): between Menlo St.23/100 20 years July/August 2020 <br />to western terminus (dead end). Remove and replace <br />asphalt surface (estimate 1,695 tons) <br />West Ave. 136th (Residential): between Aurora Dr.38/100 20 years Aug./Sept. 2020 <br />and Menlo Street. Remove and replace asphalt <br />surface (estimate 1,288 tons) <br />Also included in the FY21 work is the purchase of a “rent-to-own” cold milling machine (previously <br />approved by the City Council via Resolution 2019-006), utilizing SB1 funds for payments to occur <br />over Fiscal Years 2020 and 2021. <br />Page 4 City of San Leandro Printed on 4/15/2020 <br />669
The URL can be used to link to this page
Your browser does not support the video tag.