My WebLink
|
Help
|
About
|
Sign Out
Home
Stormwater Treatment Measures and Controls Maintenance Agreement 062019
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2019
>
Stormwater Treatment Measures and Controls Maintenance Agreement 062019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2020 10:31:06 AM
Creation date
4/30/2020 1:45:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/1/2019
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Treatment Measure Operation and Maintenance <br />Inspection Report to the <br />City Engineer <br />City of San Leandro <br />835 East 14a' Street <br />San Leandro, CA 94577 <br />This report and attached inspection checklists document the inspection and maintenance conducted for the <br />identified stormwater treatment measure(s) subject to the Maintenance Agreement between the City and the <br />property owner during the annual reporting period indicated below. <br />Property Information: <br />Property Address or APN: 07713-0855-012-0 <br />Property Owner: Heritage Baptist Church <br />Contact Information: <br />Name of person to contact regarding this report: Alan Fong <br />Phone number of contact person: 510-357-7023 Email: pastorna,HBC.org <br />Address to which correspondence regarding this report should be directed: <br />2960 Merced St San Leandro CA 94577 <br />III. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections and maintenance <br />of the identified treatment measures during the time period from January 1 to December 31 , <br />IV. Treatment Measure Information: <br />The following stormwater treatment measures (identified treatment measures) are located on the property <br />identified above and are subject to the Maintenance Agreement: <br />Identifying <br />Number of <br />Treatment <br />Measure <br />Type of Treatment Measure <br />Location of Treatment Measure on the <br />Property <br />1 <br />Bio -retention planter- <br />East side of parcel <br />2 <br />Bio -retention planter <br />South side of parcel <br />3 <br />Flow through planer- <br />Northwest corner of new proposed building. <br />4 <br />Flow through planer <br />West side of new proposed building. <br />Z:\20091A09593-5\Documents\O&M Agreement\O&M Agreement_Updated.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.