My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2020 0518
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0516
>
5A Public Hearings 2020 0518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 7:26:57 PM
Creation date
5/13/2020 7:26:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/18/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
DescriptionCurrent FeeReferenceProposed FeeExplanationENGINEERING AND TRANSPORTATION DEPARTMENT 1 General EncroachmentSLMC §5‐1‐225A. Permit$65.00 B.1 Inspection/Plan Review/Permit IssuanceInspection = $125.00/hour; Inspection = $129.00/hour;Plan Check Engineer = $152.00/hour;Plan Check Engineer = $157.00/hour;Technical Assistance = $103.00/hour;Technical Assistance = $106.00/hour;Senior Engineer = $186.00/hour;Senior Engineer = $192.00/hour;Principal Engineer = $205.00/hour;Principal Engineer = $211.00/hourDirect Costs for Plan Check Services ConsultantB.2 Permit + Inspection Fee $65 (Permit) + 1.5 hours (Minimum Inspection Time) (estimated inspection requirements = 1.5 hours C. Parklet Program‐‐ Application Fee $150‐‐ Design Review Deposit As determined by City Engineer‐‐ Restoration Deposit $2,500‐‐ Inspection $125.00/hour$129.00/hour‐‐ Plan Review$152.00/hour$157.00/hourD. Inspection/Security/Plan Review DepositAs determined by City Engineer to insure prompt, high quality repairs and to cover estimated ii dliE. No Permit Penalty FeeDouble Inspection Fee and Permit FeeF. Annual Sidewalk Repair Program ‐ Sidewalk Inspection Cost of work performed by the City contractor or as described in SLAC §8.1.120 "Repairs"SLAC §8.1.120G. AgreementDirect Costs (1)H. Overhead Banner Installation and Removal$150.00 I. News rack Permit$55.00 + $5.50 per news rack Maintenance Deposit$100.00 + $5.00 per news rack2 Subdivision:A. Parcel Map Waiver/Lot Line Adjustment/ or Certificate of Compliance Direct Costs (1); $1,600 initial depositB. Parcel Map Direct Costs (1); $4,000 plus $100 per lot initial depositC. Tentative/Final Map Direct Costs (1)D. Subdivision Improvement Plan Review Direct Costs (1)3 Building Permits:A. Plan ReviewDirect Costs (1); $65.00 minimumB. Agreement PreparationDirect Costs(1)4 Large Format Copies (see also Community Development Dept.)$10.00 for first sheet and $2.00 for each sheet thereafter plus Direct Costs (1)5 Park Facilities Development Impact Fees (2)SLMC §7‐13‐100 Park Land Acquisition Fee:SLAC §8.8.100 Single Family$16,781SLMC §7‐1‐820$17,301Engineering News Records CPI 3.1% Multi‐Family$14,667$15,122Engineering News Records CPI 3.1% Special Unit $7,334$7,562Engineering News Records CPI 3.1% Accessory Dwelling Unit (3)$6,356$6,554 maximum (No fee when < 750 sq. ft.)Engineering News Records CPI 3.1% Park Improvement Fee: Single Family$2,686$2,730Engineering News Records CPI 3.1% Multi‐Family$2,348$2,387Engineering News Records CPI 3.1% Special Unit $1,173$1,193Engineering News Records CPI 3.1% Accessory Dwelling Unit (3)$1,017$1,034 maximum (No fee when < 750 sq. ft.)Engineering News Records CPI 3.1% Total Acquisition and Improvement Fee: Single Family$19,466$20,031Engineering News Records CPI 3.1% Multi‐Family$17,014$17,509Engineering News Records CPI 3.1% Special Unit $8,508$8,755Engineering News Records CPI 3.1% Accessory Dwelling Unit (3) $7,374$7,588 maximum (No fee when < 750 sq. ft.)Engineering News Records CPI 3.1%6 Grading Permits:A. Permit $65 B. Inspection$125.00/hour$129.00/hourC. Inspection DepositAs determined by City EngineerD. Plan ReviewPlan Check Engineer = $152.00/hour;Plan Check Engineer = $157.00/hour; Principal Engineer = $205.00/hourPrincipal Engineer = $211.00/hourE. Performance BondAs determined by City EngineerSLMC §7‐12‐605F. Erosion and Sediment Control BondEstimated cost for erosion and sediment controlSLMC §7‐12‐6107 Public Works Projects:A. City Standard Plans (Printed or CD)$10.00 B. Bidder: City Projects Plans & Specification Documents purchased at City Hall Direct Costs (rounded to nearest $5) or a minimum of $25.00C. Bidder: City Project Plans & Specification Documents purchased via mailDirect Costs (rounded to nearest $5) or a minimum of $25.00 + mailing costs8 Overhead Utility ConversionA. Residential DevelopmentLesser of:SLMC §5‐3‐325 i) Actual cost per linear foot of property frontage, orUnderground Utility District Master Planii) $1,583.33 per dwelling unit, orii) $1,609.71 per dwelling unit, or1.70%iii) $396.20/LF of property frontageiii) $402.80/LF of property frontage1.70%B. Non‐Residential DevelopmentLesser of:i) Actual cost per linear foot of property frontage, orii) $396.20/LF of property frontageii) $402.80/LF of property frontage1.70%9 City Property Use Application FeeDirect Costs (1)(1) Direct Costs: Hourly personnel charge plus a factor of 33% for benefits, 54% for indirect overhead charges and 87% for staff support charges.(2) Park Development Fees created with Reso. 2000‐64, and amended with Reso. 2005‐069 & Reso. 2019‐074.(3) Impact fee for ADUs 750 sq. ft. or larger shall be charged proportionately in relation to the size of the primary dwelling unit, per CA Gov't Code Section 65852.2.New note23
The URL can be used to link to this page
Your browser does not support the video tag.