My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2020 0518
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2020
>
Packet 2020 0516
>
5A Public Hearings 2020 0518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 7:26:57 PM
Creation date
5/13/2020 7:26:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/18/2020
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
DescriptionCurrent FeeReferenceProposed FeeExplanationPUBLIC WORKS SERVICES DEPARTMENT – Environmental Services Section 1 Hazardous Materials StorageSLMC 3-3-300A. Annual fees for storage of combustible liquids, corrosives, flammable gases, flammable liquids, flammable solids, nonflammable gases, organic peroxides, other regulated materials, oxidizers, poisonous gasses, poisonous materials (1)Quantity Range 1 $ 128.00 Quantity Range 1 $132.00 Increase by 3.31% CPI rounded to whole dollarQuantity Range 2 $257.00 Quantity Range 2 $266.00Increase by 3.31% CPI rounded to whole dollarQuantity Range 3 $370.00Quantity Range 3 $382.00Increase by 3.31% CPI rounded to whole dollarQuantity Range 4 $483.00Quantity Range 4 $499.00Increase by 3.31% CPI rounded to whole dollarQuantity Range 5 $603.00Quantity Range 5 $623.00Increase by 3.31% CPI rounded to whole dollarB. Annual Fees for Storage of Radioactive Materials (1)$178.00 $184.00Increase by 3.31% CPI rounded to whole dollarC. Aboveground Tank Installation Permit (2) First Tank$941.00 $972.00Increase by 3.31% CPI rounded to whole dollar Each Additional$314.00 $324.00Increase by 3.31% CPI rounded to whole dollarD. APSA Facility Annual Fee Qualified Facility (Tier I/Tier II)$157.00 $162.00Increase by 3.31% CPI rounded to whole dollar Non-Qualified Facility (full SPCC)$276.00 $285.00Increase by 3.31% CPI rounded to whole dollar2 Accidental Release Program:SLMC 3-3-300 Additional Review by City Staff$157.00/hour$162.00/hourIncrease by 3.31% CPI rounded to whole dollar Additional Review by third partyDirect Costs plus 10%Direct Costs + 10%Increase by 3.31% CPI rounded to whole dollar Annual Fee: Program 1$612.00 $632.00Increase by 3.31% CPI rounded to whole dollar Program 2$796.00 $822.00Increase by 3.31% CPI rounded to whole dollar Program 3$1,032.00 $1,066.00Increase by 3.31% CPI rounded to whole dollar Program 4$1,549.00 $1,600.00Increase by 3.31% CPI rounded to whole dollar3 Underground Hazardous Materials StorageSLMC 3-3-300A. Annual Operating Permit: Each Tank$135.00 $139.00Increase by 3.31% CPI rounded to whole dollarB. New Tank Installation (2)ꞏ First Tank$2,822.00 $2,915.00Increase by 3.31% CPI rounded to whole dollarꞏ Each Additional$314.00 $324.00Increase by 3.31% CPI rounded to whole dollarC. Tank Removal, Repair, Alterations (2)ꞏ First Tank$1,568.00 $1,620.00Increase by 3.31% CPI rounded to whole dollar Each Additional$250.00 $258.00Increase by 3.31% CPI rounded to whole dollarD. Minor Repairs and Alterations Hourly Rate$157.00/hour$162.00/hourIncrease by 3.31% CPI rounded to whole dollar4Hazardous Waste On-site Treatment:CA Health & Safety C Annual Fees: Permit-by-Rule $1,166.00 $1,205.00Increase by 3.31% CPI rounded to whole dollar Conditional Authorization $498.00 $514.00Increase by 3.31% CPI rounded to whole dollar Conditional Exempt $135.00 $139.00Increase by 3.31% CPI rounded to whole dollar5Hazardous Waste GeneratorsCA Health & Safety CA. Annual Fees for Generators of Hazardous Waste (3)$178.00 - CESQG $184.00 - CESQG Increase by 3.31% CPI rounded to whole dollar$357.00 - SQG $369.00 - SQGIncrease by 3.31% CPI rounded to whole dollar$641.00 - LQG $662.00 - LQGIncrease by 3.31% CPI rounded to whole dollar$178.00 - UWG $184.00 - UWGIncrease by 3.31% CPI rounded to whole dollar$89.00 - CESQG 0$92.00 - CESQG0Increase by 3.31% CPI rounded to whole dollar6CalEPA CUPA Surcharge FeeAs required by State of CaliforniaCA Health & Safety Code; Title 277 File Review :SLAC 6.4.100A. PhotocopyingSee City-Wide B. Copies of Site Lists$157.00/list8 Plan Review :SLMC 3-3-100A. City Staff Hourly Rate$157.00/hr.$162.00/hourIncrease by 3.31% CPI rounded to whole dollarB. Outside ContractorDirect Costs plus + 10%C. Recycling Program$157.00/hrMoved to "8. Solid Waste & Recycling"D. Waste Management Plan$104.00Moved to "8. Solid Waste & Recycling"9 Wastewater Pretreatment:No change for FY 21 in Section 9A. All UsersSLMC 3-15-510 Service Charge – Per Connection SLAC 12.5.110(e)-- Weekly Activity $1,831.00 per month-- Semi-Monthly Activity $915.00 per month-- Monthly Activity $458.00 per month-- Bi-Monthly Activity $229.00 per month-- Quarterly Activity $153.00 per month-- Semi-Annual Activity $76.00 per month-- Annual Activity $38.00 per month 35
The URL can be used to link to this page
Your browser does not support the video tag.