Laserfiche WebLink
<br /> <br /> <br />Consulting Services Agreement between City of San Leandro and CSG Consltant, Inc. for Washington Avenue Reconstruction Exhibit B – <br />Page 2 of 3 <br />3. Geotechnical <br />Investigation <br /> <br />3a. Pavement and <br />Soil Testing <br /> $6,455 $6,455 <br />3b. Evaluate <br />Pavement Treatment <br />58 $9,760 $4,840 $14,600 <br />3c. Pavement <br />Evaluation Report <br />36 $6,960 $5,780 $12,740 <br />3d. Drilling and <br />Reproduction <br /> $2,700 $2,700 <br />Task Subtotal 94 $16,720 $19,775 $36,495 <br />4. Data <br />Collection <br /> <br />4a. Field <br />Reconnaissance <br />40 $6,480 $6,480 <br />4b. Review Utility <br />Maps <br />10 $1,460 $1,460 <br />Task Subtotal 50 $7,940 $7,940 <br />5. Utility Potholing <br />5a. Potholing 40 $7,000 $28,752 $35,752 <br />Task Subtotal 40 $7,000 $28,752 $35,752 <br />6. 50% Design <br />6a. Traffic Signal <br />Plans <br />0 $- $4,865 $4,865 <br />6b. Civil Plans 248 $39,760 $39,760 <br />6c. Specifications 42 $8,040 $8,040 <br />6d. Engineer’s <br />Estimate <br />30 $4,860 $4,850 <br />6e. QA/QC 20 $3,800 $3,800 <br />Task Subtotal 340 $56,460 $4,865 $61,325 <br />87