Description urrent Fee Reference
<br />Proposed Fee
<br />Explanation
<br />COMMUNITY DEVELOPMENT DEPARTMENT- Building Regulations Division
<br />1 Plans and Specifications See Engineering & Transportation Department Item 7, Public Work Project!
<br />2
<br />Building Permit Fees
<br />A. Filing and Issuance Fee $128 plus valuation fees and/or other building fees as listed below
<br />Re -filing Fee for each resubmittal, deferred submittal, and/or revision after 1st resubmittal, or upon 50% of Filing and Issuance Fee per occurrence
<br />2nd resubmittal for plan check on same project
<br />B. Permit Fee
<br />Determination of Valuation for Fee -Setting Purposes: Valuation shall be based on total value of all construction work, as determined by the Building Official, including all finish work, roofing,
<br />electrical, plumbing, heating, air conditioning, elevators, fire -extinguishing systems and any other permanent equipment).
<br />For new construction project valuations which the Building Official believes are understated at submittal, valuation may be determined using the most current International Code Council (ICC)
<br />valuation table modified to account for a regional construction cost modifier of 16% or the most currently available regional construction cost modifier (i.e. construction value in ICC Table
<br />1.16).
<br />For tenant improvement, residential remodels, or other projects that do not involve new square footage project valuations which the Building Official believes are understated at submittal,
<br />valuation may be determined using, up to 50% of, the most current International Code Council (ICC) valuation table modified to account for a regional construction cost modifier of 16% or the
<br />most currently available regional construction cost modifier (i.e. up to 5096 of construction value in ICC Table * 1.16).
<br />Note: The Building Official may adjust the plan checking/permit fee for an individual project when
<br />costs to the City are not congruent with this fee schedule.
<br />i) New Buildings, Additions, Tenant Improvements, Residential Remodels, and Combined Mechanical,
<br />Electrical and/or Plumbing Permits
<br />$1 to $5,000 $191
<br />$5,001 to $10,000 $191 for the first $5,000 plus $57.24 for each add'I $1,000 or fraction thereof, to
<br />and including $10,000
<br />$10,001 to $50,000 $477 for the first $10,000 plus $16.70 for each add'I $1,000 or fraction thereof, to
<br />and including $50,000
<br />$50,001 to $100,000 $1,145 for the first $50,000 plus $15.27 for each add'I $1,000 or fraction thereof,
<br />to and including $100,000
<br />$100,001 to $500,000 $1,908 for the first $100,000 plus $12.40 for each add'I $1,000 or fraction thereof,
<br />to and including $500,000
<br />$500,001 to $1,000,000 $6,869 for the first $500,000 plus $4.58 for each add'I $1,000 or fraction thereof,
<br />to and including $1,000,000
<br />$1,000,001 and up $9,158 for the first $1,000,000 plus $4.35 for each additional $1,000 or fraction
<br />thereof over $1,000,000
<br />ii) Stand -Alone Plumbing Permit
<br />Up to $2,000 $96
<br />$2,001 to $5,000 $191
<br />$5,001 to $10,000 $191 for the first $5,000 plus $38.16 for each add'I $1,000 or fraction thereof, to
<br />and including $10,000
<br />$10,001 and up $381 for the first $10,000 plus $12.72 for each additional $1,000 or fraction
<br />thereof over $10,000
<br />iii) Stand -Alone Electrical Permit
<br />Up to $2,000 $96
<br />$2,001 to $5,000 $191
<br />$5,001 to $10,000 $191 for the first $5,000 plus $38.16 for each add'I $1,000 or fraction thereof, to
<br />and including $10,000
<br />$10,001 and up $381 for the first $10,000 plus $12.72 for each additional $1,000 or fraction
<br />thereof over $10,000
<br />iv) Stand -Alone Mechanical Permit
<br />Up to $2,000 $96
<br />$2,001 to $5,000 $191
<br />$5,001 to $10,000 $191 for the first $5,000 plus $38.16 for each add'I $1,000 or fraction thereof, to
<br />and including $10,000
<br />$10,001 and up $381 for the first $10,000 plus $12.72 for each additional $1,000 or fraction
<br />thereof over $10,000
<br />v) Residential 1 and 2 Family Re -roof
<br />a) Main dwelling roof $266 all sizes and materials
<br />b) Detached garages and accessory structures on same property as main dwelling and done at the $85
<br />same time as the main dwelling roof.
<br />vi) Inspection of the installation of an earthquake gas shutoff valve $32.40 with no Filing & Issuance Fee
<br />
|